An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TRPC Smart Corridors: implementing DTA using DYNAMEQThe 22nd INTERNATIONAL EmmeUsERS’ CONFERENCESeptember 16, 2011Portland, or BharathPaladugu TRPC Clyde Scott Independent Consultant Ming-Bang Shyu Fehr & Peers

  2. Presentation outline • TRPC Smart Corridors project overview • DTA model development using DYNAMEQ • TRPC Modeling set up and vision • I-5/US 101 Interchange Feasibility Study • Where do we go from here?

  3. Geography THURSTON COUNTY SMART CORRIDORS

  4. SMART CORRIDORS PROJECT OVERVIEW • To improve multimodal traffic operations on the corridors. • Analyze operational needs • Evaluate alternatives such as signal coordination and transit signal priority • Investment strategy • So, what tool do we use? • Traffic operations at a regional scale DTA MODEL

  5. DYNAMEQ DTA model development • Import regional model from EMME • Network refinements: • Intersection controls and geometry • Signal timing data for about 80 signalized intersections • Centroid loading points • OD Trip Matrices: • SOV, HOV, Trucks • PM Peak 1-hour trip tables from EMME • 30-minute shoulders • Calibration/Validation: • Link counts and Intersection turning movement counts • Travel time and speed data • Lane queues

  6. Simulation results OUTFLOW DENSITY

  7. TRPC Models set up and vision EMME MODEL DYNAMEQ MODEL

  8. I-5/US 101 Interchange Feasibility Study • Key system Interchange • Safety and mobility issues • To identify existing and future needs • Analyze a range feasible alternatives - • Capital improvements • Ramp metering • Shoulder running

  9. I-5/US 101 STUDY NETWORK REFINEMENTS I-5/US 101 Study Subarea Model Smart Corridors Model

  10. Dta assignment Convergence Trip Tables • Modes: SOV, HOV, Trucks • PM Peak Period - 2 hours • PM peak hour demand from EMME model • 30 minute shoulders • Peaking factors

  11. ALTERNATIVES ANALYSIS BRAIDED RAMPS

  12. RESULTS – MANDATORY LANE CHANGE

  13. RESULTS – QUEUE LENGTHS

  14. RESULTS – NODE DELAYS

  15. RESULTS - DENSITY

  16. CONCLUSIONS AND NEXT STEPS • DTA model and Planning for Operations • DYNAMEQ and opportunity for the jurisdictions to integrate signal coordination efforts • Data needs • Subarea – can we fill the donut hole back? • Best practices to coordinate EMME/DYNAMEQ model developments

  17. THANK YOU Contact – BharathPaladugu 360.741.2510 paladugub@trpc.org www.trpc.org www.facebook.com/trpc.org twitter.com/#!/TRPCorg