1 / 31

Strahinja Sam Pavic MBA, B.Sc.(Hons.) Electrical/Electronic Engineering, MIEAust, CPEng, NER

TRANSITION OF THE JPEU ENGINEERNG MANAGEMENT SYSTEM TOWARDS THE EXPLOSIVE ORDNANCE SAFETY PROGLAM ENHANCES SAFETY OF THE EXPLOSIVE ORDNANCE TEST AND EVALUATION. Strahinja Sam Pavic MBA, B.Sc.(Hons.) Electrical/Electronic Engineering, MIEAust, CPEng, NER

kyleellis
Download Presentation

Strahinja Sam Pavic MBA, B.Sc.(Hons.) Electrical/Electronic Engineering, MIEAust, CPEng, NER

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TRANSITION OF THE JPEU ENGINEERNG MANAGEMENT SYSTEM TOWARDS THE EXPLOSIVE ORDNANCE SAFETY PROGLAM ENHANCES SAFETY OF THE EXPLOSIVE ORDNANCE TEST AND EVALUATION

  2. Strahinja Sam Pavic MBA, B.Sc.(Hons.) Electrical/Electronic Engineering, MIEAust, CPEng, NER Over 35 years of experience in T&E, over 11 years in EO Proof, Test and Evaluation Chief Engineer for Joint Proof and Experimental Unit (JPEU) Joint Logistics Command Peter Jezierski MME, MIEAust Over 15 years experience in the JPEU EO Proof, Test and Evaluation Systems Support Engineer, JPEU Joint Logistics Command

  3. Joint Proof and Experimental Unit (JPEU) • JPEU Activities • JPEU Engineering/Technical Management System • New regulatory environment • T&E System

  4. Joint Proof & Experimental Unit Headquarters Proof & Experimental Establishment Proof & Experimental Establishment Port Wakefield (SA) Graytown (VIC) JPEU

  5. Joint Proof and Experimental Unit (JPEU) Proof and test activities conducted by JPEU are the last and the most important activities in ensuring safety of EO and WS used by ADF. Safety of the JPEU activities and its equipment is ensured by JPEU’s accredited Engineering and Maintenance Management System (EMS). Engineering system is accredited by the Explosive Ordnance Safety Regulator (EOSR) and Maintenance Management system is accredited DTR-A.

  6. Joint Proof and Experimental Unit (JPEU) As the Proof, Test and Evaluation Centre for individual items of EO JPEU is responsible to develop and use appropriate methods, procedures and equipment for all tests and/or calibrations. Established Test and Calibration methods are to ensure accuracy, traceability, and reliability of data. JPEU is accredited by National Association of Testing Authorities (NATA) for Electronic Pressure, Velocity and Action time (EPVAT) for small arms ammunition and non destructive radiographic testing.

  7. Scope of JPEU NATA accreditation: • 6.01 Radiographic interpretation applicable to the following • .01 Welded joints • .02 Castings • .03 Wrought products .04 Components, composite products and assemblies • 6.04 Radiographic imaging capability • .01 Film .02 Digital scanning of film images • 13.99 Other materials and products Explosive ordnance - electronic pressure, velocity and action time (EPVAT) by Manual of Proof and Inspection (MOPI) Section 12(D(2004)1) at Graytown (all natures)

  8. Joint Proof and Experimental Unit (JPEU) JPEU performs a variety of tasks that have the potential to impact on the technical integrity of the data it produces, the items being tested (or decisions that others will make based upon the data JPEU provides) and the safety of test personnel. These tasks include: • Design and conduct of the following T&E activities: • Static and dynamic testing of EO, WS and related assemblies; • Environmental testing of EO and non EO item/s, including making determinations on the handling and transporting of stressed EO.

  9. Joint Proof and Experimental Unit (JPEU) • Limited equipment design and management, covering: • Test related design activities including new designs and changes, • Introducing and commissioning test apparatus, • Developing or modifying work instructions and test procedures with technical content. • Conducting technical risk assessments.

  10. Joint Proof and Experimental Unit (JPEU) • Modifications to EO for the purpose of proof, test and evaluation • Breakdown of EO to: • support ammunition investigations and/or component testing; • develop training aids; or • render EO items inert. • Technical investigations. • Maintenance and repair activities including non-destructive test and inspection.

  11. JPEU Engineering Management System Engineering Management System (EMS) within JPEU was first time accredited in Aug 2006 by DTR-A. EMS is defined by the JPEU Technical integrity Management Directive (TIMD). The JPEU TIMD regulates conduct of: • Test Activities • Design/Modification Test equipment • EO Modifications • Limited Configuration management • Maintenance activities The V984 Vibration System is used to simulate transport vibration conditions

  12. JPEU Engineering Management system • Engineering Activities within JPEU: • Test related • Development/design of the • Test methods or procedures • Test equipment related • Design and production • Weapon System • Acquisition/commissioning • Maintenance • Activities within EMS are conducted through Design Control Process (DCP). The Admiralty Lightweight Shock Test Machine

  13. DCP JUDGEMENT OF SIGNIFICANCE TECHNICAL INFORMATION REVIEW OR ENGINEERING SUPPORT REQUEST INCORPORATION APPROVAL DESIGN SPECIFICATION AND DESIGN DEVELOPMENT PLAN JUDGEMENT OF SIGNIFICANCE (INITIAL) DESIGN ACTIVITIES INCORPORATION DESIGN PLANNING CONFIGURATION VERIFICATION DDI AND JPEU SERVICE RELEASE APPROVAL TO PROCEED WITH DESISGN DEVELOPMENT DESIGN REVIEW AND APPROVAL STATUS ACCOUNT VERIFICATION AUDIT AND CLOSURE ENGINEERING PROJECT DESIGN ACCEPTANCE ENGINEERING ACTIVITY

  14. Design Control Process • PLAN • Good plan - 80% finished job • GET EXECUTIVE ENDORSMENT • Budget • Human Resources • DESIGN/ REVIW/ APPROVE • Conducted and produced by authorized engineering personnel • GET FINANCIAL APPROVAL • INCORPORATE YOUR DESIGN • COMMISION • EXECUTIVE RELEASE

  15. DCP Evaluation Management of the process depends on traceability and ability to demonstrate compliance to the regulations – Record Keeping Internal evaluation – Audit • Process oriented • Within old system • Outcome oriented • Within new system

  16. JPEU EMS Internal Evaluation • Internal Audit through QMS • Internal Audits are conducted by qualified internal auditors, and supported by technical staff. • The results of these internal evaluations are documented in Audit Reports and include all observations and Corrective Action Requests (CARs). • Internal Audits are reported at regular management review meetings. • Corrective and preventative actions are undertaken as for external quality audits.

  17. JPEU EMS within new environment • Latest version of the JPEU TIMD (to be published by the end of year) is concentrated on safe outcomes of JPEU technical and engineering activities. • Safe design of T&E activity • Safe Conduct of T&E activity • Accurate and reliable report • Constitute part of the EO system safety program • Direct influence on decisions related to EO safety

  18. JPEU EMS within new environment Safety outcomes of JPEU Technical/Engineering activities is achieved by ensuring that: • Decisions to undertake any activity related to EO are properly informed • Advice to inform those decisions is provided by competent and authorised people • The level of effort and evidence is proportional to the risk • A Safety Case approach is employed for every activity

  19. JPEU EMS within new environment • Decisions to undertake any activity related to EO are properly informed • Specification • Relevant information related to EO • Relevant information related to WS • Any incidents or accidents related to particular design • Current JPEU capability • Any other information related to activity

  20. JPEU EMS within new environment Advice is provided by competent and authorised people • Authorised personnel • Scope of authority • Mechanical design • Electrical/electronic design • EO design modifications • T&E related activity • Technical/Maintenance • Operational • Level of Authority • Level 2 senior EO, engineering/technical • Level 1 EO, engineering/technical • Technical Officer

  21. JPEU EMS within new environment The level of effort and evidence is proportional to the risk • Two stage Judgement of significance • Full Design Report including Safety Case • System safety program when required • Simplified Technical certification • Task assessment • Reporting (short vs. long) Gun barrel cleaning system

  22. JPEU EMS within new environment A Safety Case approach is employed for every activity • Safety Case for each design or design modification • Demonstrate risk reduction So Far As Reasonably Practicable (SFARP) • Propose interim measures and constraints when SFARP is not achievable Cartridge Drilling Rig

  23. JPEU EMS within new environment Safe Practice Safe Outcome Safe Place Safe Materiel ??

  24. Equipment Personnel JPEU EMS System Safety concept MIL-STD-882 defines system safety as: “The application of engineering and management principles, criteria, and techniques to optimize all aspects of safety within the constraints of operational effectiveness, time, and cost throughout all phases of the system life cycle.” Test Platform - WS PROCESS OUTCOME REQUIREMENT Environment Context System Safety concept within T&E Environment

  25. SFARP another buzz word ? • TRM Total Risk Management • IRM Integrated Risk Management • HRM Holistic Risk Management • ERM Enterprise Risk Management • EWR Enterprise Wide Risk

  26. SFARP another buzz word ? Whatever the buzz word is, it is important to remember: • In the face of uncertainty risk management is all about - how well can an organization successfully understand and manage the opportunities and the associated threats that can confront it in meeting OR not meeting its objectives • Corporate Governance, Compliance and Due Diligence depend on demonstrating a strong understanding of risks and appropriate means of successfully managing them. • Internal and External (third party) Audits are needed to provide the assurance that measures are in place and that they are effectively providing the risk control required.

  27. Hydraulic Bullet Pulling Apparatus

  28. Resistance Box Firing Box 5"54 Primer Function Jig and Firing Box

  29. 9MPa Large Hydrostatic Pressure Test Vessel

  30. JPEU Engineering Practices STANAG 4 Control/Command/DAS STANAG 2 - EO Preparation Battery

  31. QUESTIONS? THANK YOU FOR YOUR ATTENTION