Simulations for EXL - NeuLAND

Simulations for EXL - NeuLAND. Catherine Rigollet KVI - University of Groningen. Need decisions on:. Location and architecture of LAND detector Position of DSSD and PCDD detectors Material and shape of beam tube. LAND. DSSD & PCDD. Planning assumption 10 m between target and LAND

kylia
Download Presentation

Simulations for EXL - NeuLAND

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Simulations for EXL - NeuLAND Catherine Rigollet KVI - University of Groningen R3B-EXL Collaboration meeting

  2. Need decisions on: • Location and architecture of LAND detector • Position of DSSD and PCDD detectors • Material and shape of beam tube LAND DSSD & PCDD R3B-EXL Collaboration meeting

  3. R3B-EXL Collaboration meeting

  4. Planning assumption • 10 m between target • and LAND • Only 9 m available R3B-EXL Collaboration meeting

  5. Architecture of LAND at NESR The (w)hole problem: • Rearrangement of LAND paddles around beam pipe • How to do this? R3B-EXL Collaboration meeting

  6. Reconstruction of p and E of light charged ejectiles • Deflection • Energy loss (effective thickness of tube) • Material of beam tube • Simulations R3B-EXL Collaboration meeting

  7. Milestones Proton detection: • Decision on beam pipe material and shape by 12/2007 • Decision on prototypes Si strip + diamond detectors 12/2009 • Full prototype tests 12/2011 Neutron detection: • Layout of LAND modules in EXL geometry by mid 2011 • Construction of LAND in EXL geometry 12/2012 R3B-EXL Collaboration meeting