1 / 16

Status on CLIC Long Quadrupole Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

Status on CLIC Long Quadrupole Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC). “CLIC 6 th Stabilization Meeting’ on 9 June 2009”. Long (2-m) Main Beam Quadrupole prototype a remind…. Aim of this quadrupole prototype:

Download Presentation

Status on CLIC Long Quadrupole Prototype for Stabilization Studies (M. Modena, CERN –TE/MSC)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status on CLIC Long Quadrupole Prototype for Stabilization Studies(M. Modena, CERN –TE/MSC) “CLIC 6th Stabilization Meeting’ on 9 June 2009”

  2. Long (2-m) Main Beam Quadrupole prototypea remind…. Aim of this quadrupole prototype: • Provide quickly a prototype for the stabilization studies • Test different poles and coils assembly solutions (towards stabilization performances) • Provide a magnet for developing and testing magnetic measurement system (very small and long magnet bore!) “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE

  3. a remind…. 3 assembly options “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE

  4. Quadrupole Cross-Section: Final EM Optimization “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE (Courtesy of A.Vorozhtsov) a remind…. NOTE: a gap of 3 mm between iron poles and coils is left to test different solutions for coils support/dumping system

  5. Quadrupole Prototype procurement Status: • Copper conductor : Ordered (with Luvata- Finland) • Iron: Ordered (AFNOR C10 R type) • Tender Drawings:Completed this week • Coils Call for Tender: Send out hopefully this week to 3 Companies • Iron machining: Selecting potential bidders “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE

  6. “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

  7. “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

  8. “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

  9. “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

  10. “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

  11. “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

  12. “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

  13. “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE Courtesy of R. Leuxe EN-MME

  14. “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE

  15. “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE

  16. “”CLIC 6th Stabilization Meeting’ on 9 June 2009” M. Modena – CERN/TE

More Related