1 / 16

Alton Plaza

Alton Plaza. Alton, Texas. ALTON PLAZA.

kyoko
Download Presentation

Alton Plaza

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Alton Plaza Alton, Texas 2012

  2. ALTON PLAZA • CENTENNIAL PLAZAis a Mixed Use developmentlocatedon5 Mile line / Trenton, in thewestarea of McAllen Areawithinthe City of Alton. Theprojectsitson a 5.0-acre tract of land and there’s a proposedBank orPharmacy in thecorner of Mayberry and 5 Mile line, a 22,100 sfretail and office plaza and 4 restaurants. • Theprojectwill be named THE ALTON PLAZA, in honor of the City of Alton whereasestablished.

  3. LOCATION

  4. ALTON PLAZA will consist of two buildings. The main one arranged to have a business with service of drive thru with a total profitable surface of approximately 9,600 sq.ft. dedicated to retail areas and/or office services. In the Second building has been intended for commercial areas that can be combined with spaces of 800 sq. ft. and 1,000 sq.ft. respectively in a total area of 9,600 Sq.Ft. • The three tract of land at the front are planned to be Pad Sites for restaurant, pharmacy or a bank, and counts on an approximate profitable surface of 3 acres.

  5. About City of Alton

  6. Commerce and Retail CENTER BEFORE NOW • At one time Alton was a small colonia north of Mission, Texas. The City of Alton was incorporated on April, 1978. This historic event allows the residents of the community direct input in their self governance and also allows the city to manage its growth in a more orderly manner and to provide greater economic development opportunities to its citizens. •  Today Alton is experiencing a population explosion. According to the U.S. Census, the population of the city in 2000 was just below 5,000 residents. Latest estimates from the U.S. Census place our population at 7,500 residents. We anticipate by 2010 Alton’s population will be 10,000 – double its population in 2000. •    In just the past 15 months, the city has facilitated the approval of over 1000 new residential lots, two 75 multi-family units, jump started the city’s economic development corporation, facilitated the establishment of a chamber of commerce and finalized the construction and financing plans for a new city hall.

  7. Valley International Airport, Harlingen, TX • Miller International Airport. Mc Allen, TX • Aeropuerto de la Cd de Reynosa, TAMPS • Hidalgo / Reynosa International Bridge • Anzaldúas International Bridge

  8. McAllen-Mission Metro Area # 1 in USA • The Rio Grande Valley experienced a growth in the population from 383,000 to 570,000 during the 1990's. As of today, with a population of more than 800,000 it is stimulated by the low prices, its proximity to Mexico and the NAFTA. • The south of Texas improve its economy and the employment has grown, enlarging job opportunity in a faster way, more than any another Metropolitan Area in the Nation

  9. SITE PLAN

  10. MAIN BUILDING

  11. PROPOSED BUILDING

  12. MASTER PLAN

  13. PROFITABLE INVESTMENT Sq.Ft. 9,700 Lease $2.00 Pre Sale $110.00 Sale( Once finished) $145.00 • Phase I • 9,700 Sq.Ft $2.00/Month US$ 19,400.00 • ANNUAL INCOME: US$ 232,800.00 • * TAXES, INSURANCE, AND MAINTENANCE IS NOT INCLUDED. LEASEE IS IN CHARGE OF THEM. • Estimated at 100% of occupation.

  14. BUSINESS PROJECTION

  15. MARKETING

  16. The time calculated for the construction and finish in the job site is from 6 to 8 counted months once initiated itself. This timeline includes the corresponding building permits. It is intended to utilize in the construction different products and friendly systems with the environment that offer efficiency in the consumption of electric power. • Taking advantage of the presale is going to give the benefit of buying with discount in the price

More Related