Beltana Development. ACARP Roadway Development Operators Workshop Sept. 2007. Beltana Hunter Valley NSW. Beltana. Blakefield South. Blakefield South. Beltana Development. Beltana Update. Blakefield Update. USA Systems Study. Supporting a High Capacity Longwall. Beltana.
E N D
Beltana Development ACARP Roadway Development Operators Workshop Sept. 2007
Beltana Development • Beltana Update. • Blakefield Update. • USA Systems Study. • Supporting a High Capacity Longwall.
Beltana • Total of 28 Million tonnes mined to date. • Total of 80 km of roadway driveage to date.
Beltana 2007 • Total of 5.5 Million tonnes mined to date. • Total of 16.5 km of roadway driveage to date.
Single or Super • Single Miner MG7 Cut Rate m/hr 4.2 Metres/wk 340 Belt Moves17.8 V’s Super Unit MG8 MG9 4.95.6 389373 17.6 19.9
Single or Super • Single Miner MG7 Eng Avail. 91.8 Op Avail. 77.6 Op Time. 78 V’s Super Unit MG8 MG9 93.8 88 74.975.4 74.8 67
Single or Super • Single Miner MG7 Pillar Cycle 3.6 Total Metres 7,421 Days / Panel159 V’s Super Unit MG8 MG9 3.43.5 6,5557,045 114 132
Single or Super • Single Miner v’s Super Unit • Gains • Cut Rate 112% • Metres / Week 125% • Pillar Cycles 103% • Days / Panel 119%
Single or Super • Single Miner v’s Super Unit • Losses • Maint Quality • Standards • Belt Moves / Parallel Tasks • Production Maintenance. • Sustainability
Changes at Beltana • Back into Mains Driveage • Starting a 2nd Crew • Self Hired • Integration of Crews • Change in Development Structure • Addition to Development Management Team • Each Crew self sufficient • Maintain Single Panel Focus.
Single Miner What will it support at Beltana • Development at340m per week • Equates to 144mLWretreat / wk • Equates to 165,600t/ wk • 6.95 Million Tonnes / yr
Strategies • Key Points to our Strategies • Manning. • Standards. • Measurement. • Continuous Improvement. • Fit for purpose equipment. • Communication.
Blakefield South • 173km of Driveage • 44.6 million ROM tonnes • 400m Longwall Face • 6.7 million Tonnes / Year • 9 year Life
Blakefield South • Up to 10m3/t if insitu CH4 • High volumetric capacity ventilation system maximum 580m3/sec. • Force–exhaust (pressure balanced) ventilation system. • 7 heading mains / 3 heading gate roads.
USA System Study • Review Strategies for future Development systems. • Review 3 Hdg Gate Road Development. • Review Continuous Haulage. • New Technology.
Mines Visited • Peabody Highland • FCT in Room and Pillar Operation. (High Voltage Miners.) • Consol Loveridge • 3 Hdg Development and changing from batch Haulage to FCT. (ABM’s.) • Cumberland • 3 Hdg Development. (Miner Bolters and Mobile Bolters.)
Mines Visited • Twenty Mile • 3 Hdg Development (Place Changing.) • High Producing Mine. • San Juan • 3 Hdg Development (place Changing.) • Good Technology. • Joy Franklin • New Technology ED miners, Automatic Drill Rigs and FCT’s.
Specialise • The Americans Specialise everything they do. • Whether it be in Motels, Restaurants, Roadwork's and Coal Mining.
Development • Place Changing • Up to 8,200ft / mth = 2,500m / mth • Bolter Miners • Up to 6000ft / mth = 1830m / mth • FCT Operation Room and Pillar • Up to 700ft / shift = 210m / Shift • 21m / hr (Approx 8,500m / mth)
3 hdg DevelopmentOpportunities • Design FCT Operation(Consol Loveridge) • ABM 14’s • Joy 4 FCT • Auxiliary Ventilation • To give a 50% improvement in Gate Road Development. • Process Cost Saving • Up to 9000ft / Month = 2,750m / Month
Where we are at Now • Beltana Bolter Miner • Joy 12CM12 • 2 Joy 10SC32 Shuttle Cars (16t) • Breaker Feeder (18t bunker capacity at 1700tphr) • Auxiliary Ventilation • 5.5m/hr • Up to 6200ft / mth = 1888m / mth
Development • Where does Development need to be? • What maximum production can we expect from a single Longwall?
Some Facts • 7million tonne Longwall (400m face at 1740 t/m) • 2hdg Development 2.88m/hr • 3hdg Development 4.51m/hr • 10million tonne Longwall • 2hdg Development 4.11m/hr • 3hdg Development 6.44m/hr
Some Facts • 12million tonne Longwall • 2hdg Development 4.93m/hr • 3hdg Development 7.73m/hr • 15million tonne Longwall • 2hdg Development 6.17m/hr • 3hdg Development 9.67m/hr
Low Hanging Fruit Obtained • Process Improvement Old 7.2Day Pillar Cycle New 3.6 Day Pillar Cycle • Total Process Improvement 100 %
FCT Model For Beltana • From Data measured at Beltana a Cut Rate after a belt move of 8.92 m/hr can be achieved. • Joy FCT Modelled a rate8.98m/hr with a Joy 12CM12D. • Therefore we believe an average cut rate with an FCT for a 100m pillar cycle would be in the order of 8 to 9m/hr. • This would be a 70% increase in this part of the Process.
Opportunities • Bolter Miners • 14ED25 being built in USA to go into Consol McElroy which commenced production 1st May 2007. • ABM 25’s Used throughout QLD and NSW • Automated bolting • Self Drilling Bolt
Opportunities • Continuous Haulage Systems • Joy4FCT • Stamler Chain Haulage • Prairie System • Sandvik Continuous Haulage
Summary • To Advance to the next step in Longwall Production Development has to do something different. • By 3 to 5 years time we need to have developed a new system so Longwall Coal is not restricted.
Development • Can’t keep doing the same and expect something different. • 12 Million Tonne Longwalls being supported by 500 people. • This is not sustainable.