16 % Budget Reduction. 35% Budget Reduction. 52 % Budget Reduction. 25% Budget Reduction. Maintenance. Employees 11 6 FTE. ImpactS. Deferred Maintenance Buildings Streets Trees Sidewalks Storm Drains Slower Delivery times. Development Services Department. Public Works
E N D
16 % Budget Reduction 35% Budget Reduction 52 % Budget Reduction 25% Budget Reduction
Maintenance Employees • 11 6 FTE
ImpactS • Deferred Maintenance • Buildings • Streets • Trees • Sidewalks • Storm Drains • Slower Delivery times
Development Services Department • Public Works • Engineering/Capital Projects/Maintenance • Sewer Enterprise • Treatment / Collection • Planning and Building • Planning / Building / Code Enforcement/ Rental Inspections
MAINTENANCE BACKLOG • No tree trimming program • No sidewalk maintenance program • Roof at Senior Center • Roof at City Hall • Bank of Pinole Building • Faria House • Limited monies for streets
Slurry Seal $.30 - $.40 per SF Street Maintenance Costs Based Upon Roadway Conditions
Slurry Seal $.30 - $.40 per SF $3 - 4 per SF Overlay Street Maintenance Costs Based Upon Roadway Conditions
Slurry Seal $.30 - $.40 per SF $3 - 4 per SF Overlay Street Maintenance Costs Based Upon Roadway Conditions $ 7 -9 + per SF Reconstruction
El Cerrito Contra Costa 145 53 50 50 62 73 Pinole Contra Costa 119 71 71 70 70 69
Slurry Seal $.30 - $.40 per SF $3 - 4 per SF Overlay Street Maintenance Costs Based Upon Roadway Conditions $ 7 -9 + per SF Reconstruction
Funding Sources: RDA Measure J
Measure J • City’s Annual Amount = $ 289,000 • Less WCCTAC Funding = $ 42,000 • Less Maintenance Operations = $ 58,000 • Available for Projects = $189,000
$ 1.3M / yr $300 k / yr
$ 50,000 to Slurry Seal • $ 500,000 to Overlay
Building / code enforcement / rental inspections Employees • 3 1 FTE
Impact • Code Enforcement is reactive • Slower response times • Limited rental inspection
Engineering and Projects Employees • 6 3 FTE
Impact • Slower delivery of projects • Project compete for staff time • Measure WW and Plant Upgrade • Limited pursuit of grants
Other Public Works Department Needs • NPDES Requirements • Clean Water Program • Quality of water in storm drain system • Funding limited to $35/ parcel assessment • Regulations increasing
Other Public Works Department Needs • Park Maintenance • Chemical System for the Swim Center • New Restrooms at Fernandez Park • No identified Funding Source • Measure WW Eligible
Other Public Works Department Needs • Storm Drainage Maintenance • No funding sources