1 / 25

35% Budget Reduction

16 % Budget Reduction. 35% Budget Reduction. 52 % Budget Reduction. 25% Budget Reduction. Maintenance. Employees 11  6 FTE. ImpactS. Deferred Maintenance Buildings Streets Trees Sidewalks Storm Drains Slower Delivery times. Development Services Department. Public Works

laith-grant
Download Presentation

35% Budget Reduction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 16 % Budget Reduction 35% Budget Reduction 52 % Budget Reduction 25% Budget Reduction

  2. Maintenance Employees • 11  6 FTE

  3. ImpactS • Deferred Maintenance • Buildings • Streets • Trees • Sidewalks • Storm Drains • Slower Delivery times

  4. Development Services Department • Public Works • Engineering/Capital Projects/Maintenance • Sewer Enterprise • Treatment / Collection • Planning and Building • Planning / Building / Code Enforcement/ Rental Inspections

  5. MAINTENANCE BACKLOG • No tree trimming program • No sidewalk maintenance program • Roof at Senior Center • Roof at City Hall • Bank of Pinole Building • Faria House • Limited monies for streets

  6. Capital Investment / Maintenance

  7. Slurry Seal $.30 - $.40 per SF Street Maintenance Costs Based Upon Roadway Conditions

  8. Slurry Seal $.30 - $.40 per SF $3 - 4 per SF Overlay Street Maintenance Costs Based Upon Roadway Conditions

  9. Slurry Seal $.30 - $.40 per SF $3 - 4 per SF Overlay Street Maintenance Costs Based Upon Roadway Conditions $ 7 -9 + per SF Reconstruction

  10. El Cerrito Contra Costa 145 53 50 50 62 73 Pinole Contra Costa 119 71 71 70 70 69

  11. Slurry Seal $.30 - $.40 per SF $3 - 4 per SF Overlay Street Maintenance Costs Based Upon Roadway Conditions $ 7 -9 + per SF Reconstruction

  12. Funding Sources: RDA Measure J

  13. Measure J • City’s Annual Amount = $ 289,000 • Less WCCTAC Funding = $ 42,000 • Less Maintenance Operations = $ 58,000 • Available for Projects = $189,000

  14. $ 1.3M / yr $300 k / yr

  15. $ 50,000 to Slurry Seal • $ 500,000 to Overlay

  16. Building / code enforcement / rental inspections Employees • 3  1 FTE

  17. Impact • Code Enforcement is reactive • Slower response times • Limited rental inspection

  18. Engineering and Projects Employees • 6  3 FTE

  19. Impact • Slower delivery of projects • Project compete for staff time • Measure WW and Plant Upgrade • Limited pursuit of grants

  20. Other Public Works Department Needs • NPDES Requirements • Clean Water Program • Quality of water in storm drain system • Funding limited to $35/ parcel assessment • Regulations increasing

  21. Other Public Works Department Needs • Park Maintenance • Chemical System for the Swim Center • New Restrooms at Fernandez Park • No identified Funding Source • Measure WW Eligible

  22. Other Public Works Department Needs • Storm Drainage Maintenance • No funding sources

More Related