130 likes | 268 Views
Introduction Presentation Oil in Oman Project. IBM Client Center, Amsterdam, The Netherlands March 2013 By Michiel van der Griendt. Personal Introduction. Name: Michiel van der Griendt Pre-university: Grotius College, Delft University: Mechanical Engineering (BSc.),
E N D
Introduction Presentation Oil in Oman Project IBM Client Center, Amsterdam, The Netherlands March2013 By Michielvan der Griendt
Personal Introduction Name: Michiel van der Griendt Pre-university: Grotius College, Delft University: Mechanical Engineering (BSc.), Sustainable Process and Energy Technology (MSc.) Delft University of Technology Company: CB&I since 2007
Educational Introduction: Energy Technology assignment in Bolivia “An integral analysis of a UN program for rural electrification with renewable energy”
Educational Introduction: Study Tour to China
Objective of this presentation: This presentation introduces you to CB&I as an engineering company and to the Oil in Oman project. The Oil in Oman project is part of the Jet-Net initiative. This initiative promotes engineering among pre-university students and shows how the oil and gas industry is related to what you learn at school.
Refining Power/ Cogeneration Chemicals/ Petrochemicals Oil & Gas Offshore Oil & Gas Onshore CB&I Lummus Business Sector CB&I Lummus provides engineering, procurement, fabrication and construction of upstream and downstream process facilities for the oil and gas industry.
Oil in Oman project description Make a bid for the basic design of an oil refinery for the government of Oman. For the project CB&I will represent the client. All details related to the project can be found in the student manual.
Group representatives will visit visit our The Hague office on the 4th and 5th of February. The schedule is as follows: 3A: Monday the 4th of Feb. 13h50 at CB&I i.e. Oostduinlaan 75 3B: Tuesday the 5th of Feb. 14h35 at CB&I i.e. Oostduinlaan 75 3C: Tuesday the 5th of Feb. 13h50 at CB&I i.e. Oostduinlaan 75 3D: Tuesday the 5th of Feb. 12h50 at CB&I i.e. Oostduinlaan 75 3E: Monday the 4th of Feb. 14h35 at CB&I i.e. Oostduinlaan 75 Make sure you have sent all relevant questions to mvandergriendt@cbi.com before Monday the 30th of January A delegation of CB&I will attend your final presentation and judge your bid on the 15th of February. Oil in Oman: project execution
Questions??? non scholae sed vitae discimus