1 / 32

Term Project: Balsa Wood Bridge Part 1

Term Project: Balsa Wood Bridge Part 1. Turning Ideas Into Reality. Engineering Design Process. Read section 2.2, pp. 37-47. What is the difference between an optimist, a pessimist and an engineer?. Optimist: the glass is half full Pessimist: the glass is half empty

lamond
Download Presentation

Term Project: Balsa Wood Bridge Part 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Term Project: Balsa Wood Bridge Part 1

  2. Turning Ideas Into Reality Engineering Design Process Read section 2.2, pp. 37-47

  3. What is the difference between an optimist, a pessimist and an engineer? Optimist: the glass is half full Pessimist: the glass is half empty Engineer: the glass has a 50% overall inefficiency

  4. Engineering Job Functions • Analysis • Design • Test • Development • Sales • Research • Management • Consulting • Teaching In your project you will • “Research” • Design • Analyze • Build • Test • And learn about the engineering design process

  5. you want to build a bridge The Engineering Design Process Span > 30cmMass < 30g made of Balsa etc. Rules • browse web resources • look at Seattle bridges • study rules etc. 1. Customer Needor Opportunity 2. Problem Definition/ Specifications 3. Data and Information Collection 4. Development of Alternative Designs 5. Evaluation of Designs/ Selection of Optimal Design 6. Implementation of Optimal Design Deliverable 1 Analyze Designs (software) Deliverable 2 Build and Test Deliverable 3 Note: this last one is not quite true!

  6. Cautionary Notes: 1. Technically our last step (Testing) would NOT be the implementation. • It would still be part of step 5, finding the optimal design. • We would test and then evaluate the results to optimize. 2. There are different versions of the Engineering Design Process. The one presented here is just one of them.

  7. Example: What went Wrong? The Tacoma Narrows Bridge Disaster

  8. Example: Engineering Design in Action Mars Rover Curiosity in class: 0:00-0:50 and 9:45-16:00 at home: watch the rest (pretty amazing)

  9. What is left today? • rules • some physics without math • deliverables • links • forming teams • materials and logistics Note: the second part of the presentation will cover the software and questions.

  10. Term Project: Balsa Wood Bridge Part 2

  11. Let’s Start the Modeling Software … You can find the software on the project tab of our website: http://seattlecentral.edu/faculty/rheller/Engr110/classproject.html and clicking on Modeling Software Or you can go directly to: http://www.jhu.edu/~virtlab/bridge/truss.htm

  12. How to find the Modeling Software Click on Class Project

  13. How to find the Modeling Software Click on Modeling Software

  14. How to find the Modeling Software Read the instructions Then … To start click on bridge truss

  15. Bridge Terminology • Your bridge will have • Two trusses • Joints or Nodes • Members • One fixed node • One horizontal rolling node • Loads (at least one)

  16. What does the software do? For a given LOAD the software will calculate the FORCE(compressive or tensile) in each member. The software can only do this if you follow the RULES

  17. Bridge Rules • Your bridge MUST have • One fixed node • One horizontal rolling node • Loads (at least one) • And (most importantly) … N= # of nodes (including the support nodes) M= # of members

  18. How many members? M = 7 How many nodes? N = 5 M + 3 = 2 N 7 + 3 = 2 x 5

  19. Why? • To find out take STATICS, Engr214 (offered in fall) • Statically determinate system

  20. Modeling a Bridge Step 1: Start with NODES

  21. Modeling a Bridge Step 2: Convert one node to fixed node and one to horizontal, rolling node

  22. Note on fixed and rolling nodes • You have to first create a node. • Then you select ‘fixed node’ and click on the node you want to be fixed. • You cannot click on fixed node directly.

  23. Modeling a Bridge Step 3: Add members

  24. Modeling a Bridge How many members? How many nodes? M + 3 = 2 N 14 + 3 = 2 x 9 17 = 18 (oops)

  25. Modeling a Bridge Add a load … … or better two Error Message

  26. Modeling a Bridge – Correct version How many members? How many nodes? M + 3 = 2 N 15 + 3 = 2 x 9 18 = 18

  27. Modeling a Bridge – Correct version Click on Calculate Then click anywhere on the grid …

  28. Modeling a Bridge

  29. What does this mean? Find the total load: Find the member under the highest compression: Find the member under the highest tension:

  30. What are you looking for? • Note: the loads are relative. Doubling the load will double all forces. • For a given load, you want the maximum compressive and tensile forces to be as small as possible. • If the material behaves better under tension, then your tensile forces can be a little higher.

  31. Apply your load realistically.

  32. Let’s Form Teams • Find a team member. • Make sure you have matching schedules. • Exchange email and phone info. • When you have a partner, come to me and I will write down your names. Have fun!

More Related