Historic Ship Enclosure Group 4
Design Requirement • Transparent enclosure providing an air-conditioned weather-proof environment • Crow’s nest experience • Multi-storey building with large spaces Group 4
Inspiration Waves created by bow of a ship The Great Wave off Kanagawa Ship in condition of being titled by waves Group 4
Conceptual Design Progress 1 Progress 2 Progress 3 Progress 4 Group 4
Final Design Group 4
Final Design Similar to Corporation Street Footbridge , Manchester Group 4
Structure of the building Group 4
Plan view of adjacent building Group 4
The sequence of bracing Group 4
Crow’s nest Side view Group 4
Crow’s nest Group 4
Critical members A section of Crow’s nest Group 4
Sway Sensitivity Wind Foundation Group 4
SWAY SENSITIVITY Wind Foundation Foundation Group 4
Construction materials Composite Slabs • Easy to design • Little restrictions compared to alternatives Glass Cladding – Hybrid Series 3 curtain wall system • High insulation timber/aluminium composite system • Designed to meet current and future building regulations Steel members • Using an electric arc furnace achieving up to 100% recyclable Group 4
Construction Process Group 4
Sustainability • Stimulate Local Economy • Social Benefit • Structural Steel Frame : • 80% recycle • Electric arc furnace • reusable Group 4
Question Time! Group 4