1 / 8

Korea Meteorological Administration 2010. 2. 25.

Report on GISC Operational Capabilities. Korea Meteorological Administration 2010. 2. 25. SIMDAT project status and plans, SIMDAT Technical workshop, ECMWF 26-27 February 2007. KMA Network. Wind profilers (13 sites). 논리망. Seismometers/ Accelerometers (109). Lightning sensors (24 sites).

lan
Download Presentation

Korea Meteorological Administration 2010. 2. 25.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report on GISC Operational Capabilities Korea Meteorological Administration 2010. 2. 25.

  2. SIMDAT project status and plans, SIMDAT Technical workshop, ECMWF 26-27 February 2007

  3. KMA Network Wind profilers (13 sites) 논리망 Seismometers/Accelerometers (109) Lightning sensors (24 sites) LIDAR (4 sites) Radiosondes (10 sites) AWS (544 sites) RADAR (10 sites) Video-conferencing (66 sites) Buoys (7 sites) Marine CCTVs (14 sites) PM10 (28 sites)

  4. http://www.ecmwf.int/services/computing/rmdcn/

  5. COMIS-3 & MISS-DP • Two operational systems in 24x7 mode • Slightly different UI • Almost identical source codetree • “Identical” Databases • COMIS-3 on the Intranet • MISS-DP on Internet

  6. Jeju (22 Aug 2008)

  7. Live demo of MISS-DP

More Related