1 / 12

ATLAS-Muons R&D on Micromegas ( Weekly meeting) Outcome for the segmentation in 2-fold option

ATLAS-Muons R&D on Micromegas ( Weekly meeting) Outcome for the segmentation in 2-fold option. Patrick PONSOT on behalf of the scrutiny committee. 2013/07/23. s TGC dead zones?. New 3D models and drawings have been provided Updated on the 21 of July 2013 Thanks to George and Benny!

lance
Download Presentation

ATLAS-Muons R&D on Micromegas ( Weekly meeting) Outcome for the segmentation in 2-fold option

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ATLAS-MuonsR&D on Micromegas (Weekly meeting)Outcome for the segmentationin 2-fold option Patrick PONSOT on behalf of the scrutiny committee 2013/07/23

  2. sTGC dead zones? • New 3D models and drawings have been provided • Updated on the 21 of July 2013 • Thanks to George and Benny! • Modifications • The outer radius of the first module is increased of 10mm • The clearance between first and second modules is reduced from 10 to 4mm • The outer radius of the second module is increased of 4mm • The clearance between second and third module is reduced from 10 to 6mm • Dead zones between modules • Between first and second modules DZ1=35mm (20+4+11) • Between second and third modules DZ2=37mm (20+6+11) sTGC design is still in progress and a new version with light modifications will arrive on tomorrow (to adjust the shape of the boards) CEA-Saclay/DSM/Irfu/SIS/LCAP - Patrick PONSOT for the scrutiny committee

  3. sTGC - New dimensions? • New dimensions on drawing for large sectors + 10mm, but clearances have been decreased from 10 to 4mm and to 6mm CEA-Saclay/DSM/Irfu/SIS/LCAP - Patrick PONSOT for the scrutiny committee

  4. sTGC - New dimensions? • New dimensions on drawing for small sectors + 10mm, but clearances have been decreased from 10 to 4mm and to 6mm CEA-Saclay/DSM/Irfu/SIS/LCAP - Patrick PONSOT for the scrutiny committee

  5. Radial overlaps with 2 MM modules? • Large sector: The option 5-3 for PCBs has been chosen during the Roma meeting (MMM workshop on the 15-16th of July) • Dimensions have been adjusted to have 5mm clearance between the 2 modules 2220 1410 2042 Option 5-3 2310 660 CEA-Saclay/DSM/Irfu/SIS/LCAP - Patrick PONSOT for the scrutiny committee

  6. Radial overlaps with 2 MM modules? • Small sector: The option 5-3 for PCBs is the safer option • The X dimension can be adjusted from 1280 to 1400mm, X<=1300mm proposed by INFN to better match present construction facilities 1780 Option 6-2 too closed to sTGC dead zone 1350 X Option 5-3 is the safer option Option 4-4 too closed to sTGC dead zone 2210 460 CEA-Saclay/DSM/Irfu/SIS/LCAP - Patrick PONSOT for the scrutiny committee

  7. Radial overlaps with 2 MM modulesoption 5-3 (for PCBs) • The small and large sectors are represented on the same sketch in a vertical position Small sector Large sector sTGC MM sTGC CEA-Saclay/DSM/Irfu/SIS/LCAP - Patrick PONSOT for the scrutiny committee

  8. Radial overlaps with 2 MM modules CEA-Saclay/DSM/Irfu/SIS/LCAP - Patrick PONSOT for the scrutiny committee

  9. Radial overlaps with 2 MM modules CEA-Saclay/DSM/Irfu/SIS/LCAP - Patrick PONSOT for the scrutiny committee

  10. CONCLUSION CEA-Saclay/DSM/Irfu/SIS/LCAP - Patrick PONSOT for the scrutiny committee

  11. Thank you for your attention ! Commissariat à l’énergie atomique et aux énergies alternatives Centre de Saclay| 91191 Gif-sur-Yvette Cedex T. +33 (0)1 69 08 79 30 | F. +33 (0)1 69 08 89 47 Etablissement public à caractère industriel et commercial | RCS Paris B 775 685 019 DSM IrfuSIS/LCAP (PC N°12, Bt 123)Patrick PONSOT CEA-Saclay/DSM/Irfu/SIS/LCAP - Patrick PONSOT for the scrutiny committee

  12. Backup CEA-Saclay/DSM/Irfu/SIS/LCAP - Patrick PONSOT for the scrutiny committee

More Related