200 likes | 698 Views
Work Processes for the PCA Special Interest Groups (SIG’s) Magne Valen-Sendstad POSC Caesar Association (PCA). Standardised in ISO 15926-2. Data Model. Core Classes. Common Terminology. Standardised in ISO 15926-4. Standardised by e.g. ISO /IEC/ ANSI/ BS/DIN, represented using ISO 15926.
E N D
Work Processes for the PCA Special Interest Groups (SIG’s) Magne Valen-SendstadPOSC Caesar Association (PCA)
Standardised in ISO 15926-2 Data Model Core Classes Common Terminology Standardised in ISO 15926-4 Standardised by e.g. ISO /IEC/ ANSI/ BS/DIN, represented using ISO 15926 Standard Classes Part 4 +(Part 3) (SC4 RDDB scope) Product Catalogues represented using ISO 15926 RDL ISO 15926 - Data Model and Reference Data Library Physical Object, Activity, Property Classes + Part 5 and 6 for the process Proprietary Classes
ISO 15926-4 Initial Set (Subject to Maintenance) • ISO-TS 15926-4 ACTIVITY PROPOSED SET • ISO-TS 15926-4 BASICS PROPOSED SET • ISO-TS 15926-4 CLASS OF CLASS PROPOSED SET • ISO-TS 15926-4 CONNECTION MATERIAL PROPOSED SET • ISO-TS 15926-4 CONTROL FUNCTION PROPOSED SET • ISO-TS 15926-4 ELECTRICAL PROPOSED SET • ISO-TS 15926-4 ENCODED INFORMATION PROPOSED SET • ISO-TS 15926-4 HEAT TRANSFER PROPOSED SET • ISO-TS 15926-4 INFORMATION PROPOSED SET • ISO-TS 15926-4 INSTRUMENT PROPOSED SET • ISO-TS 15926-4 PIPING PROPOSED SET • ISO-TS 15926-4 PROPERTY PROPOSED SET • ISO-TS 15926-4 PROTECTION PROPOSED SET • ISO-TS 15926-4 ROTATING EQUIPMENT PROPOSED SET • ISO-TS 15926-4 SOLID HANDLING PROPOSED SET • ISO-TS 15926-4 STATIC EQUIPMENT PROPOSED SET • ISO-TS 15926-4 TRANSPORT PROPOSED SET • ISO-TS 15926-4 UOM PROPOSED SET • ISO-TS 15926-4 VALVES PROPOSED SET PCA will form SIG’s to at a minimum cover this scope
PCA Staff PCA SIG The Maintenance and the Validation Teams • Maintenance Team • A group of experts that may be set up by a parent committee following the rules in the ISO/IEC Directives for the establishment of Working Groups • A MT may be called upon by the TC/SC secretary to provide expertise in the preparation of change requests or items for evaluation or validation • Validation Team • A permanent, “executive”, group of individuals appointed by and acting as delegates on behalf of their National Bodies • Seems to meet SC4 needs • Single Maintenance Team • Multiple sector-specific Validation Teams
Board of Directors General Manager Technical Advisory Board (TAB) SIG Health, Safety & Environment SIG Drilling & Completion SIG Development & Modification SIG Reservoir & Production SIG Operation & Maintenance SIG Subsea Equipment Staff *) Technical Advisory Board and SIG’s O&G Production Facilities & Process Plants *) SIG – Special Interest Group
Proposed Initial SIG’s • Basic RDL • Electrical • Instrumentation • Rotating Equipment • Static Equipment • Heat Transfer • Piping & Valves Properties should be dealt with within the respective SIG’s Activities the same way. Will probably not be top priority.
WIP SC4 Normal process for the maintenance of existing standards as databases
PCA will develop a set of procedures to mirror this process and corresponding status codes Proposal to SC4 RDDB or PCA approved PCA Process for the Development of PCA RDL and submissions of propsals to ISO
3 B C 2 1 A
Consequences • PCA RDS/WIP is the tool for both PCA RDL and SC4 RDDB • The PCA RDL will in principle cover the whole triangle • Only the ‘Core’ RDL level is within the scope of the SC4 RDDB under the current regime • May be extended to cover the ‘Standard’ level? Must be covered! • Objects may be accepted in the PCA RDL, but be rejected by or be out of scope for the SC4 RDDB • References to external names and identifiers are expected to be a central part of the PCA RDL (Ref. AEX, BIM etc.) • Outside scope for the SC4 RDDB • We will therefore have to have separate regimes, incl. status codes for the PCA RDL and the SC4 RDDB • Levels of procedures • SC4 will prepare procedures and status codes based on the ISO/IEC Directives, ISO Supplement Annex ST, Procedure for the development and maintenance of standards in database format (STD_DBs N52 (Rev.1)) • The PCA Procedure and Status codes will mirror the SC4 Procedures • Levels of Procedures: ISO/IEC-> ISO SC4 -> PCA.
ISO 15926 • ISO 15926 Integration of life-cycle data for process plants including oil and gas production facilities • ISO 15926 - 1 Overview and fundamental principles(Approved IS) • ISO 15926 - 2 Data model(Approved IS) • ISO 15926 - 3 Geometry. (Approved TS) • ISO 15926 - 4 Initial reference data. (Approved TS)(Included in the RDS) • ISO 15926 - 5 Procedures for registration and maintenance of reference data (NWI/CD pending resolution on MA) • ISO 15926 - 6 Scope and methodology for developing additional reference data (NWI/CD to be submitted to ISO Q3 2007) • ISO 15926 - 7 Implementation methods for the integration of distributed systems(TS submitted to ISO Q3 2007)