Every home has a kitchen and a bathroom, and these are probably among the most used rooms in the house. These types of rooms are the best to remodel because the increase in value and enjoyment is easy to see. However, remodeling both rooms and each other appears to be a big project. It should be noted, however, that if one will plan well it is entirely feasible to redesign both the bathroom and the kitchen at one go.

Download Presentation

Is It Possible to Remodel a Bathroom and Kitchen Simultaneously?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Is It Possible to Remodel a Bathroom and Kitchen Simultaneously? landmarkremodelingcompany.com

  2. Introduction Every home has a kitchen and a bathroom, and these are probably among the most used rooms in the home. These types of rooms are the best to remodel because the increase in value, as well as enjoyment, is easy to see.

  3. Planning the Remodel The key is to plan well in advance. Spend time researching designs, materials, and contractors. Develop blueprints showing the layout of plumbing, electrical, and other infrastructure. Schedule the remodel during a time when one or both rooms can be out of use. Allow at least 90 days for the project. Kitchen Remodeling Services in Santa Monica can help develop foolproof plans.

  4. Our Feature Project Apply for required building permits. Get multiple estimates from contractors to set a realistic budget. Factor in costs of fixtures, appliances, flooring, cabinets, countertops, plumbing and electrical work. Add 25% as a contingency for unexpected expenses. Have funding secured before starting work.

  5. INTERIOR DESIGNER Down to the Details Carefully schedule phases like demolition, rough-in of plumbing and wiring, and installation of drywall and tiles. Contractors for different specializations like plumbing, electrical, flooring, etc. can work simultaneously in separate rooms. Coordinate their schedules to minimize disruption.

  6. Address Logistical Challenges Plan bathroom sink and toilet relocation carefully to not disrupt kitchen work. Sequence work so at least one of the rooms has functioning fixtures at all times. Prepare alternate cooking and cleaning areas outside the home. Arrange for temporary storage of removed cabinets, and appliances.

  7. INTERIOR DESIGNER Back on Track Stay on schedule by addressing issues promptly. Conduct progress meetings with contractors. Highlight priority tasks and address potential delays. Celebrate milestones to keep the momentum upbeat. With advanced planning and coordination between contractors, it is very possible to remodel a bathroom and kitchen at the same time.

  8. Contact Us. 323-3647687 landmarkremodelingcompany.com 3151 Cahuenga Blvd W #301, Los Angeles, CA 90068