1 / 2

How Long Does it Take To Have a New Boiler Installed

Most homeowners want to figure out how long it takes to fix a New Boiler in Bristol. It is so obvious that they seem interested in knowing the time a new boiler installation can take as it is going to disturb their home including the central heating and hot water supply.

Download Presentation

How Long Does it Take To Have a New Boiler Installed

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. How Long Does it Take To Have a New Boiler Installed? Most homeowners want to figure out how long it takes to fix a New Boiler in Bristol. It is so obvious that they seem interested in knowing the time a new boiler installation can take as it is going to disturb their home including the central heating and hot water supply. There is no exact answer to this question, the time can vary depending on various factors: • • • • • Whether you already own a boiler What fuel you are using Whether you need a replacement for your boiler Which type of boiler you already have installed Whether you’re looking to change the boiler type, if yes, which type of boiler you own and which type do you need Any complexities you’re experiencing due to the type of home or water supply, etc. • Broadly, a New Boiler Installation in Bristoltakes between 6 hours and 4 to 5 days, below, we’ve listed some examples along with the process in detail to explain further. We have not included the complex situations and included the rough estimates for common boiler installations in the majority of domestic settings: Straight Boiler Switch: 4-6 Hours This type of boiler installation is the quickest and simplest one of all as it involves replacing the old boiler with a new one of the same type. It is assumed that the old boiler is simply damaged or broken, the engineers don’t need to change the location, water supply and central heating or gas pipes are already sorted. A straight boiler switch can easily be completed in less than a day. Changing the Position of Your Boiler: 1-2 Days Changing the position of your boiler cannot be done in a day rather it requires more time. This type of installation involves various jobs like adding new pipework and connecting new electric power and thermostat cables, and it might also require some structural work. Changing the position of a boiler can probably take up to one to two days. Switching the Type of Boiler: 2-3 Days Mainly, there are three types of boilers that you can choose for your abode such as combi, heat-only and system boilers. So if you’re looking to change from one type of boiler to another, then it will require different plumbing and electrics and essentially, it can be considered as a fresh new boiler installation. The biggest switch will be from a combi boiler to a heat-only or system boiler. Installing a New Combi Boiler: 1-2 Days If you currently don’t have a boiler installed at the moment, the installation time will be roughly the same as relocating one as the amount of work involved is similar. Any time saved from not removing an old boiler will be offset by the need to create new connections to your water and gas mains. Additionally, if there is no boiler, it's likely there is no central heating system either. Installing a completely new central heating system along with a combi boiler will significantly extend the duration of the project. Typically, an entirely new system installation takes about one to two weeks because it involves tasks such as lifting carpets, flooring and floorboards, laying pipework and installing radiators. The advantage is that this can be done concurrently with the boiler installation.

  2. Switching Both the Type and Position of a Boiler: 3-4 Days If you’re considering changing both the type and position of your boiler, then this type of installation will most likely take more time (three to four days) as it involves more jobs such as adding new pipework, tanks and cylinders or removal of all or any of these. This might also include knocking holes into walls, installing new brackets and rerouting water, gas and electric supplies to the boiler. Whether you are considering switching from one boiler type to another, changing the location of your boiler, changing both the type and position of your boiler or any other type of boiler installation our boiler engineers at L & P Heating Services can help you achieve a perfect New Boiler Installation in Bristol.

More Related