Reason for Build • Increase awareness • Education • Portability • Sure beats building a moonbuggy
Storage Box Assembly • 2 boxes-72” X 13” X 15” • 3-13” X 20” doors • Commercial Welded Hinges • Welded construction • Sealed joints (rain, snow… etc.) • Total volume of each Box 16,200in^3
Testing • Hydraulic System • Hydraulic Cylinder • Pump (110vac) • Calculations-Statics, Fluids CB
Testing • Muller • Mounting, Run Test CB
Testing • Propane/Furnace • Fuel requirement for two melts • Safety CB
Fuel Consumption • 18 lb bottle • 20 lbs of propane • 2 lbs for every 15 minutes Can run furnace for 2.5 hours • There will be a back-up bottle
Process Plan • Clean up workspace • Organize garage • Axle/ Fenders • Disassemble fenders and axle from frame • Torch fenders • Unbolt axle assembly • Block up frame • Framework • Add support where needed
Process Plan • Deck • Cut out correct dimension using water jet • Bolt to frame • Boxes • Cut out correct dimension using water jet • Weld and assemble • Seal
Process Plan • Hydraulics • mount • plumbing • position and install • Furnace arms assembly • Cut out correct dimension using water jet • Machine shaft • Assemble and install • Muller rebuild • Refurbish inner and outer plows • Purchase and install pressure spring for wheels
Process Plan • Furnace rebuild • Purchase a new fire eye • Paint • Paint and detail works • Lighting/Electrical(110 vac) • Run wire and tail lights • Power switches for devices
QC issues • Furnace arm mechanism • Load distributions • Overall functionability