An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WG5 “mini-meeting” on detector costing – 6 March 2012 Link to the CLIC (detector) costing tool: https://pptevm.cern.ch/costing/gwt/cern.ppt.wbs.WBSTree/WBSTree.html CLIC_SiD detector costing – first steps To do – and “soon”: Inner Detectors (D. Dannheim, K. Elsener) -> modify vertex according to surfaces -> replace TPC+SIT+SET+FTD+ETD by full SiD silicon tracker

  2. Calorimeters (H. Gerwig, K. Elsener) ECAL -> modify number of kg of ECAL-type tungsten -> modify number of m2 of Si sensors -> scale number of channels accordingly HCAL -> modify number of kg of steel and HCAL-type tungsten -> modify number of m2 of scintillator -> scale number of SiPM etc. accordingly 3. Muon Detectors (K. Elsener, E. van der Kraaij) -> scale according to surface of layers

  3. 4. Magnet (A. Gaddi, H. Gerwig, K. Elsener) -> discuss changes to coil -> modify (scale) vac. tank and yoke -> discuss changes to “Ancillaries” Antisolenoid Magnets -> n.a. (included in accelerator costing) Electronics / DAQ -> n.a. (nothing in CLIC_ILD) Offline computing -> n.a. decided not to include this Infrastructure (A. Gaddi, K. Elsener) (N.B. the massive concrete platforms are in accelerator costing – chapter “infrastructure”)

  4. next meetings (proposal): 13 March 16:30 Magnet & Infrastructure (confirmed by A. Gaddi) around 20 March Inner Detectors (date to be fixed with D. Dannheim) 27 March 16:30 Calorimeters, Muon Detectors

  5. Spares