TOTEM Roman Pot Cards - status

TOTEM Roman Pot Cards - status. RP Motherboard Mezzanines: - “VFAT Mezzanine” - “CC Mezzanine” LVDS Repeater Card (see Giovanni slides) Digital Opto -Hybrid Module – DOHM RP Motherboard “RP MBRD” - Tests. RP Motherboard – “RPMBRD” (1).

laszlo
Download Presentation

TOTEM Roman Pot Cards - status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TOTEM Roman Pot Cards - status RP Motherboard Mezzanines: - “VFAT Mezzanine” - “CC Mezzanine” LVDS Repeater Card (see Giovanni slides) Digital Opto-Hybrid Module – DOHM RP Motherboard “RP MBRD” - Tests

  2. RP Motherboard – “RPMBRD” (1) Block Diagram Top Bottom - 4 cards V2 have been produced – this week expecting delivery; - Components are ready to be mounted on 1 pcs – start this week; - Full test needed before mounting the other 3 cards;

  3. LVDS Trigger GOH 4 LVDS to CMOS LVDS with Repeaters - 32 Outputs Coincidence Chips: - 10 x 16 Trigger Outputs TR Data Out TR VFAT S (1,3,5,7,9) CC ODD REPEATERS REPEATERS S (2,4,6,8,10) CC EVEN TR Data Valid LVDS to CMOS GOH 5 Trigger VFAT: - receive 32 Trigger Outputs from LVDS to CMOS converters; - receive T1 from PLL25; - send TR Data Out to the Data Stream (via GOH3); - send TR Data Valid to GOH4 and GOH5; Optical via - GOH4 and GOH5 - Data Valid from: TR VFAT or CCU or TR VFAT S1 bit RP Motherboard – “RPMBRD” (2) Zoom on Trigger outputs

  4. VFAT and CC mezzanines • VFAT Mezzanine: • Also Trigger VFAT (for RP Motherboard); • One VFAT chip with 32 inputs; • Standard 50pins output connector • Several PCB produced, 1 mounted , to be tested • CC Mezzanine: • One Coincidence Chip (CC); • 80 LVDS inputs; • 16 LVDS outputs; • I2C control • 3 pcs produced at CERN • Tested I2C channel only on “RPMBRD” - V1

  5. LVDS Repeater Card • LVDS Repeater Chip: • Repeat 16 LVDS signal lines; • Chip in package: TQFP64pins; • LVDS Repeater Card: • D-SUB 37pins male/female connectors; • Placed inside plastic hood; • Schematic – done and soon the layout;

  6. LVDS Repeater Chip – Tests (1) Differential Probe Power supply O U T P U T I N P U T Oscilloscope Signals Generator Differential Signal Single ended CHIP IDEAL SETUP • 2 differential probes • 2 chips on repeater cards and cable Chip + card Chip + card Delay measurement

  7. LVDS Repeater Chip – Tests (2) O U T P U T I N P U T 40MHz 2MHz

  8. TOTEM - Control System General Blocks, Characteristics • I2C for DOH outside; • few channels on LEMO; • close to DOHM • Fault repair reconfiguration example • bypass CCUM-3 Secondary DOHM B1 B2 DOH 2 B CCUM-4 CCUM-3 CCUM-N CCUM-2 CCUM-1 B1 B2 B1 B2 CCU FEC X I2C 1 A DOH 1 I2C 2 Up to 16 I2C channels each DOH controlI2C out Primary DOHM * • Two Digital Opto-Hybrids modules; • Communication and Control Unit (CCU), LVDS buffers • and multiplexer; • A and B channels: • optical from/to FEC; • electrical on the INPUT and OUTPUT connectors; • DOH I2C control from outside; • * Based on TOB DOHM from CMS

  9. DOHM - status • 25 PCB produced; • 2 mounted with DOH mezzanines - used at CERN; • - DOH mezzanines are with 2m fiber – need to be cut and spliced! • - Possible, tools exist, but it is extremely delicate procedure (expert technician CMS) • Components and cable to order for remaining

  10. CCUM Carrier B2 B2 B1 B1 A A I2C 1 I2C 2 DOH controlI2C out • Two CCUM modules; • I2C channels for DOHM and on LEMO connectors; • Can be divided on 2 independent boards – losing half of the I2C channels and second I2C • channel from next CCUM; • Schematic, Layout, Components order - stillpending • “CCUM Carrier” – is needed due to the DOH redundancy requirements and also due to the • requested I2C channels for T2 !!!

  11. Control/Readout Crate CAEN TOTFED FEC TTCci RP Motherboard - “RPMBRD” – tests (1) • System in 555 for testing RPMBRD: • - Hardware: • - PC (CAEN VME controller) + VME Crate; • - TTCci + FEC + DOHM + RPMB – for control part; • - RPMB + TOTFED + S-Link64 or VME or USB – for readout and trigger part Control Fibers Data Fibers S-Link64 RPMBRD 10 RP Hybrids PC DOHM

  12. RP Motherboard - “RPMBRD” – tests (1) - Software: - Control: - I2C access to all devices: - 10 RP Hybrids (4 VFAT + DCU each); - 2 CC mezzanines; - 1 VFAT Trigger Mezzanine; - 1 PLL25; - 5 GOH modules; - 1 CCUM module - T1 commands to VFAT; - TTCci + FEC sends command/clock to RPMB; - Synch from TTCci; - Run VFAT Hybrid tests - Readout and optical Trigger (electrical Trigger after CC mezzanine); - GOHs + TOTFED – via VME or USB; - Synch from TTCci - DCS information (Temperature, RADMON, Pressure sensors)

  13. Conclusions RP Motherboard: - V2 produced - Final Tests - in progress; - Final Production, Order of Components and Tests – pending; Mezzanines: - “VFAT Mezzanine” – prototype produced, to be tested; - “CC Mezzanine” – prototype produced, to be fully tested; LVDS Repeater – layout pending DOHM – ready for production