1 / 17

ATN 2001 18-19 September 2001

American Airlines Data Link. ATN 2001 18-19 September 2001. Frank Cheshire / Andy Fry. The Path to PETAL. Certification & Operations Approval CDG Operations Not your basic routine flights Good support a key Non-revenue test profiles Data collection Response to problems

latona
Download Presentation

ATN 2001 18-19 September 2001

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. American Airlines Data Link . . . . . . . . . . . . . . ATN 2001 18-19 September 2001 Frank Cheshire / Andy Fry

  2. The Path to PETAL • Certification & Operations Approval • CDG Operations • Not your basic routine flights • Good support a key • Non-revenue test profiles • Data collection • Response to problems • Operational sector operations • Results

  3. Certification & Ops Approval • Supplemental Type Certificate (STC) • AAL was the applicant, issued 6/06/01 • Applies to the B-767-300 with Pegasus FMC and Rockwell Collins avionics package: • CMU - 900 • VHF - 920 VHF Digital Radio (VDR) • APM • Operations Approval • Issued mid-August • Triggered start of revenue flying

  4. Charles de Gaulle Operations • Airframe Scheduling • Routing & Coordination • Non-standard routing and short flights • Lots of coordination • Kudos to lots of people/organizations • Internal to AA • Eurocontrol • CFMU and CDG ATC personnel

  5. Non-Revenue Test Profiles • Objectives outlined by Eurocontrol • Specific profiles to establish system performance • Avionics performance with “operational” ground network • Ground network • The Controller’s end • Troubleshooting • Profiles modified or repeated to check “fixes” • Aircraft variables • Lots of data collected

  6. Flight Log • 07:25:59 (AVLC) INFO (P=0) N(s)=4 N(r)=6 A/G=1 • Source Addr: 0x5102b1a, Dest Addr: 0x1a4a445 • Frame Data: • b2 48 12 a2 14 02 6a 59 c8 1b ff 66 82 1e 01 00 '.H....jY...f....' • 04 07 08 00 00 14 47 00 27 01 58 41 41 00 ee ee '......G.'.XAA...' • ee 00 2b 02 00 ac 14 2b c2 00 '..+....+........' • 07:25:59 (VDL) SQP.indication=0, Source Addr: 0x5102b1a • ROUTER MOBILE_ISH_IN 11/07/01 07:25:59 ARINC "584141EE002B" 1800 "4700270158414100EEEEEE002B0200AC142BC200"RIF ISH_IN 11/07/01 07:25:59 ARINC "4700270158414100EEEEEE002B0200AC142BC200" "584141EE002B"07:25:59 (AVLC) RR (F=0) N(r)=5 A/G=0 • Source Addr: 0x1a4a445, Dest Addr: 0x5102b1a • Frame Data: • 16 02 6a 58 b2 48 12 a3 a1 '..jX.H..........' • 07:26:44 (AVLC) INFO (P=0) N(s)=5 N(r)=6 A/G=1 • Source Addr: 0x5102b1a, Dest Addr: 0x1a4a445 • Frame Data: • b2 48 12 a2 14 02 6a 59 ca 1b ff 68 82 1e 01 00 '.H....jY...h....' • 04 07 08 00 00 14 47 00 27 01 58 41 41 00 ee ee '......G.'.XAA...' • ee 00 2b 02 00 ac 14 2b c2 00 '..+....+........' • ROUTER MOBILE_ISH_IN 11/07/01 07:26:44 ARINC "584141EE002B" 1800 "4700270158414100EEEEEE002B0200AC142BC200"07:26:44 (VDL) SQP.indication=0, Source Addr: 0x5102b1a

  7. Operational Sector Ops • The Pay-off ! • Controller-Pilot data link communications

  8. Results • The “good” news - VDLM2 works ! • The “other” news - there is room for improvement • Technical and operational suitability issues • 21 Non-revenue test profiles flown • Started data link with operational sectors on 17 August, it is continuing • PETAL an excellent proving ground • Next step - FAA Build I in Miami next year

  9. Upper E I C A S

  10. Logon Status Page

  11. M C D U Display

  12. Uplink Message

  13. A T C Log

  14. Brain Trust ?

  15. Questions ?

More Related