Standard Operation Procedures. AG610-RTA. 1.Check to see if the system is Ok. Check to see if the system is on operation condition ( green label ). Check the foregoing records in the working sheet. Check the gas valves . Check to see if the cooling water is in the correct level.

latoya
Download Presentation

Standard Operation Procedures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Standard Operation Procedures AG610-RTA

  2. 1.Check to see if the system is Ok • Check to see if the system is on operation condition (green label). • Check the foregoing records in the working sheet. • Check the gas valves . • Check to see if the cooling water is in the correct level.

  3. 2.Turn on the system • User utility permit & personal password to turn on the system. After that, the screen show the window of main menu. • To enter a mode requiring an access code, use the trackball to select the desired mode and let the system automatically prompt for the access code

  4. 3.process parameter setting P • Select the “EditRecipe” in the main menu to set the process parameters.“Recipe” includes temperature curve parameter setting and temperature control parameter seting. • The temperature range is 400 to 1050 ℃. The time range is 1 to 5 min. However, when the temperature is higher than 1000 ℃, the duration must be kept to lower than 1 min. Please contact with the engineer for special process. • The rate range is 1 to 200 (℃/sec),but it is difficult to achieve a ramping rate lower than 50 (℃/sec) or higher than 150 (℃/sec). • Select F9 to set the temperature control parameter. Correct process parameter is important to get an appropriate temperature profile. • Temperature control parameters : • T-SW: The “Time Switch” field is used to program the temperature between ramp-up and steady-state temperature. (0 ~ 500℃)

  5. Gain, DGain: They assists in achieving a desired temperature profile by eliminating overshoot, undershoot, and oscillations. (0 ~ -500) • IWarm: The first steady state value used to process the previous wafer. (0 ~ 99.99%) • ICold: The initial intensity to process the wafer. (0 ~ 99.99%) • Temperature-profile optimization guidelines • Overshoot : T-SW ↑ • •Gain ↑ • •DGain ↑ • •I-Cold ↓ • Undershoot : T-SW ↓ • •Gain ↓ • •DGain ↓ • •I-Cold ↑ • Oscillation : Gain ↑ • •DGain ↑ • Second undershoot : Gain ↓ •I-Cold ↓

  6. 4.Loading wafer • Pull out the chamber door and then put the wafer on the quartz pin. • Close the door and lock it. • Caution: • –Quartz pin is brittle, please be careful to put on the wafer • –Please contact with supervisor for special substrate or process.

  7. 5.Processing • elect “ Execute recipe” in the main menu and select Run to start processing. • It needs more care during ramping process condition. • Whenever emergency occurs, select Abort to stop process.

  8. 6.End procrss • Wait for 3~5min, after the process completed. Unlock the door to do next process. • If all the process is finished, close the door and lock it

  9. 8.Turn off the system • Check to see if all the valves are in the normal condition. • Check to see if the door is locked. • Press “F10” to main menu • Log out