SubAir Unit location

SubAir Unit location. The first step to installing a SubAir System is to select a suitable location for the unit.

latricia
Download Presentation

SubAir Unit location

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SubAir Unit location The first step to installing a SubAir System is to select a suitable location for the unit. The ideal location minimizes any disruption to the course both from a play and aesthetic standpoint. It also keeps cost to a minimum by reducing the amount of trenching for piping and electrical connections. Grade is the most important criteria. The unit should not be located in a low spot. This will help avoid water accumulation at the vault and insure proper separation of the air-water mix coming from the green.

  2. The best location for the vault is at the high-end of the green. This causes the air to flow uphill to the SubAir unit and allows the water to gravity drain down to the outfall. Locate Cleanout

  3. Once the cleanout port is located, the pipe network is laid out and trenched. After the trenches are opened, a hole for the vault must be excavated.

  4. Six inch solid drain pipe is used to connect the SubAir vault to the green’s drainage network.

  5. Air line to vault A Distributed Separator Assembly is connected to the green’s drainage network. This assembly separates the air from the water so that the air flows to the SubAir unit and the water drains to the outfall. Distributed Separator draining to Dual Valve

  6. Cleanout Airline to vault (not pictured) Typical layout for SubAir piping network. Drain line to Dual Valve

  7. A Dual Valve Assembly is installed at the end of the outfall pipe before the pipe enters a drainage basin.

  8. This is a SubAir Elite unit installed and ready to be backfilled. Vault Silencer Air Flow Diverter Airline from green (Distributed Separator)

  9. Cleanout Port Distributed Separator SubAir piping network after backfilling piping trenches and reinstalling sod. Airline to Vault Drain Line to Dual Valve

  10. Air Intake / Exhaust Once the installation is complete, only the Air Intake / Exhaust and vault inspection port are visible. Installation typically takes one day per unit and can be accomplished with minimal disruption of play. SubAir vault inspection port