1 / 27

The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis

The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis. University at Buffalo Engineering for Ecosystem Restoration Summer Workshop Series 2011 Workshop 2 Stream Restoration, Hydraulic Structure and Bioengineering Design June 13-17, 2011. Mitigation Planning.

laurel
Download Presentation

The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation ProjectAnalysis University at Buffalo Engineering for Ecosystem Restoration Summer Workshop Series 2011 Workshop 2 Stream Restoration, Hydraulic Structure and Bioengineering Design June 13-17, 2011

  2. Mitigation Planning Assessment Conceptual Design Final Design Construction Mitigation Monitoring

  3. NYSDOT Region 5 - Route 219 Extension Stream Mitigation Projects • McKinstry Creek • 2200-feet Channel Realignment and Riparian Restoration 2007

  4. Route 219 at Route 39 Springville, NY

  5. Route 219 - Cattaraugus Creek Bridge Crossing

  6. Candidate Stream Screening and Evaluation Report

  7. Lake Erie NYS Watershed Map (NYSDEC) Cattaraugus Creek Watershed NYSDEC Lake Erie Basin

  8. Research Field Assessment Data Analysis Scoring QA/QC Conceptual Planning/Design Final Design Review Specification Project Planning Contract Services Procurement Construction Oversight Regulatory Compliance Monitoring Lessons Learned Integrated Planning – Assessment, Design andRegulatory Compliance

  9. Water Budget Volume Velocity Quality Hydraulics Geology Agronomy Anthropogenic Stressors Vegetation Form Density Complexity Stability Nativity Stream Dynamics, Ecological Associations and Physical Energy

  10. Rosgen Natural Stream Classification

  11. Stream Visual Assessment Protocol • Stream Type • Reach Descriptions • Scoring Descriptions National Water and Climate Center (NWCC) Technical Note 99–1 http://www.nrcs.usda.gov/technical/ECS/aqatic/svapfnl.pdf

  12. SVAP Application • Data Research and Review • Existing, Historical, Pre-Settlement, Anecdotal • Preliminary Field Assessment • Calibrate SVAP • SVAP Field Assessment • QA/QC

  13. SVAP Environmental Conditions • Landscape Position • Soils • Hydrology • Geology • Channel Morphometry • Erosion • Sediment Loading • Riparian Ecological Characterization • Flora and Faunal Surveys and Species Associations

  14. SVAP Typical Results Reach A-1 SVAP Data Sheet Summary Parameter and Result • Dominant Land Use Forest/Successional Shrubland • Stream Length Assessed 378 feet • Bankfull Width 31.5 feet • Water Depth 2-4 inches • Maximum Bankfull Depth 2 feet • Flood-prone Width 40 feet • Dominant Substrate cobble • Pool/Riffle/Run Ratio 12:40:48 • Gradient .29  • Sinuosity Occasional bends • Rosgen Stream Type F3

  15. Cattle Interviews re: Manure Presence

  16. Channel Instability

  17. Packard Bank Revetment/Yard Protection Vinca minor groundcover

  18. The Problem: Expansion of State expressway will impact wetlands. Client required to perform mitigation projects to improve fish habitat in two creeks. The Solution: Use the HEC-RAS hydraulics model Predict low flow depths (fish passage); flood inundation area (100 year flood); sediment scour and sediment stability Use the SWAT model and Bank Stability model to predict overland runoff and bank erosion sediment loads Use the HEC-RAS SIAM module to predict sediment scour, deposition, and equilibrium Hydraulic Modeling NYSDOT - McKinstry Creek, Mansfield Creek

  19. Protocol Stream Type Regional Classification Reach Descriptions Scoring Descriptions Assessment Parameters Channel Form and Condition Hydrologic Alteration Riparian Zone Bank Stability Invasive Species Nutrient Enrichment Barriers to Fish Movement In-Stream Fish Cover Pools Invertebrate Habitat SVAP Review

  20. In Channel W:D Sinuosity Structure LWD Energy Dissipation features Off Channel Bank Instability Access Cattle/Equipment PFRs Riparian Corridor Encroachment Floodplain Disconnect Wetland Hydrology Invasive Plant Species SVAP Findings

  21. McKinstry Watershed Slope and Drainage

  22. McKinstry Upstream Watershed Land use and Delineation

  23. Conceptual Design

  24. ERR Plan View

  25. Typical Bioengineering Techniques

  26. Questions…..

More Related