Interstate 95 Managed Lanes PD&E Study (95 Express) Project Development and Environment Study

Interstate 95 Managed Lanes PD&E Study (95 Express) Project Development and Environment Study. SE FSUTMS Users Group The Corradino Group November 2, 2007. Project Area. SERPM-6 Summary. Most current and advanced SE FL model Time-of-day model with feedback (AM peak, PM peak and Off-peak)

laurie
Download Presentation

Interstate 95 Managed Lanes PD&E Study (95 Express) Project Development and Environment Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Interstate 95 Managed Lanes PD&E Study (95 Express)Project Development and Environment Study SE FSUTMS Users Group The Corradino Group November 2, 2007

  2. Project Area Florida Department of Transportation www.95Express.com

  3. SERPM-6 Summary • Most current and advanced SE FL model • Time-of-day model with feedback (AM peak, PM peak and Off-peak) • Mode choice for non-motorized, auto occupancy and all transit systems • Includes HOV lanes, and toll model for Turnpike and other toll roads • Base year is 2000, target year is 2030 Florida Department of Transportation www.95Express.com

  4. SERPM-6 Enhancements for Managed Lanes Analysis • Develop networks for 2010, 2018, and 2030 • Add High-Occupancy-Toll (HOT) lanes capability • Each Link Class has a time and cost function: • 3+ Carpools use only time • DA and carpool 2 use cost, which includes toll Florida Department of Transportation www.95Express.com

  5. HOT Lanes Method • Implemented with SERPM-6 framework • Model seeks equilibrium of impedance (time and equivalent cost) • HOV 3+ has no toll • HOV 2 and drive alone are assessed tolls • Value of time ($1.00 = 5.1 minutes) was calibrated in the toll model (mainly Turnpike) • 24 hours, transponders, no toll collection delay Florida Department of Transportation www.95Express.com

  6. Toll Calculation • Function of the V/C on the managed lanes • Logit function • Several toll ranges explored • Final function ranged between $.00 and $0.25 per mile Florida Department of Transportation www.95Express.com

  7. Alternatives • NO-Build Alternatives • 2010 : Base year networks, 2010 interpolated zonal data • 2018 : Base year networks, 2018 interpolated zonal data • 2030 : 2030 networks, 2030 zonal data • Build Alternatives • 2 Managed lanes on each direction of I-95 in the study area • Replaced HOV lanes, removed HOV slip ramp methodology, included access points at designated locations only (See next slide) • Modified the I-95/I-195 interchange • No changes in zonal data, same as No-Build Florida Department of Transportation www.95Express.com

  8. Original Access Points(recommended) Florida Department of Transportation www.95Express.com

  9. Original Access Points Contd. Starting north going southbound: • Park and ride location: • N of I-595 • Griffin road location • Miami/Broward county line location • Golden Glades interchange location • Between NW 95th St. and NW 103rd St. location • SR 112 Location Florida Department of Transportation www.95Express.com

  10. New Access Points(not recommended) Florida Department of Transportation www.95Express.com

  11. Tests Conducted • Modeling HOT lanes is still in research • No HOT lanes calibration data is available • Schedule constraints – major model development usually takes more time • Tests were conducted to meet the expected performance measures • All tests were conducted on 2030 Build Alternative Florida Department of Transportation www.95Express.com

  12. Tests Conducted Contd. • Original access points, 13¢ minimum toll, linear toll function • Access points at each interchange N of GG, 13¢ minimum toll, linear toll function • New access points, 5¢ minimum toll, linear toll function • New access points, 0¢ minimum toll, linear toll function • Original access points and 5¢ minimum toll, linear toll function • Original access points and 0¢ minimum toll, linear toll function • Original access points, 5¢ minimum toll, logit toll function • Original access points and 0¢ minimum toll, logit toll function Florida Department of Transportation www.95Express.com

  13. Macro Model Results • Entire corridor of interest was divided into 8 segments • Segments 1,2,3,4 are general purpose (GP); segments 5,6,7,8 are HOT • Weighted average performance measures were reported • Average speeds, average volumes and toll revenues were used to compare alternatives Florida Department of Transportation www.95Express.com

  14. Macro Model Results Contd. • Results Summary • Improved GP lane performance • Improved average speeds • Reduced volumes • Improved HOT lane performance • Significantly improved average speeds • Significantly increased volumes Florida Department of Transportation www.95Express.com

  15. Data Sources & Analysis Tools • Southeast Regional Planning Model 6 (SERPM6) • CORSIM Simulation Modeling System • Highway Capacity Manual (HCM 2000) Florida Department of Transportation www.95Express.com

  16. Simulation and Analysis times • 2010 AM peak hour • 2010 PM peak hour • 2018 AM peak hour • 2018 PM peak hour • 2030 AM peak hour • 2030 PM peak hour Florida Department of Transportation www.95Express.com

  17. I-95 & SR 112 Interchange Distinctive Alternatives From I-195 to NB & SB I-95 • One-lane ramp • Two-lane ramp (Preferred alternative) Florida Department of Transportation www.95Express.com

  18. Thank You Questions? Three-lane ramp (Existing alternative) Florida Department of Transportation www.95Express.com