General Mills/Henkel Corp. Superfund Site

General Mills/Henkel Corp. Superfund Site. Background and lessons learned Managers Meeting February 13, 2014. Chemical Disposal 1947-1962. 1947 Aerial Photo. Generalized Groundwater Contamination. Groundwater Contamination. Soil and Groundwater Cleanup.

Download Presentation

General Mills/Henkel Corp. Superfund Site

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. General Mills/Henkel Corp. Superfund Site Background and lessons learned Managers Meeting February 13, 2014

  2. Chemical Disposal 1947-1962 1947 Aerial Photo

  3. Generalized Groundwater Contamination

  4. Groundwater Contamination

  5. Soil and Groundwater Cleanup • 1981“absorption pit” removed addressing the soil contamination. • 1984 Response Order by Consent between MPCA and General Mills • 1985 Extraction and Treatment of Contaminated Groundwater began. • 2010 Groundwater system turned off. TCE concentrations below the cleanup concentrations established in the Consent Order

  6. Soil Gas Investigation 2012-2013

  7. Generalized Vapor Intrusion Dissolved contamination in groundwater

  8. November 6, 2013 Mailing to Residents

  9. Public Involvement • Two Public Meetings November 12, 2013 • Five Community Group Meetings • “Office hours” sessions • MPCA Project website • E-mail distribution list for interested parties • Widely covered inlocal media

  10. Sub-slab Sampling

  11. Building Mitigation

  12. Current Status

  13. Current Status Original Area of Vapor Concern • Access Agreements within Original Study Area:  166  (85% of 195 properties in Study Area) • Properties Sampled in Original Study Area: 158 Additional Study Area • Access Agreements in Additional Study Area: 77 • Properties Sampled: 65

  14. Current Status Sampling Results Original and Additional Area • Results Received and Notifications Made to Property Owner: 210 • Mitigation Needed : 118             • Resample : 12 • No Mitigation Needed: 80    Mitigation Systems • Install completed : 43 • Installs in progress : 52

  15. Lessons Learned • Age and magnitude of release • Consistent VI Investigations • Relationship of groundwater and soil gas concentrations • Partnerships • Engage with RP in ‘real-time’ • Greater transparency/ongoing engagement • Fostering a informed community • Taking care of staff

  16. Questions & Discussion