1 / 1

1. Project Description

Systems Design Project Determine the Threshold Limit during AMHS Route Down. TECH Semiconductor Singapore Pte Ltd. Department of Industrial & Systems Engineering. By: Li Longzhou , Shang Ke , Xiao Hui , Zhan Haixu Supervisors: A/P Chew Ek Peng, Dr. Hung Hui-Chih.

lazar
Download Presentation

1. Project Description

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Systems Design Project Determine the Threshold Limit during AMHS Route Down TECH Semiconductor Singapore Pte Ltd Department of Industrial & Systems Engineering By: Li Longzhou, Shang Ke, Xiao Hui, Zhan Haixu Supervisors: A/P Chew Ek Peng, Dr. Hung Hui-Chih 1. Project Description 2. Project Objectives Wafers are transported by Automatic Materials Handling System (AMHS) which requires route down (maintenance, etc) from time to time. Machines affected cannot get new inputs and will become idle after finishing all the wafers in buffer lots and thus suffer machine utilization loss. • Evaluate the impact of route down. • Determine threshold limit of route down. • Propose an optimal route down schedule. 3. Methodology • Use latest historical data to infer threshold • limit. • Use forecasted incoming WIP to dynamically • recommend route down schedule. 4. Route Down Impact Evaluation 5. Route Down Schedule Analysis 1st Choice Recommended Periods Zoom In Recommended Periods 2nd Choice

More Related