DS-2 controls the flow in the feed stream to give 75 MW

Note that I broke the recycle after the boiler. While not really necessary, it does make life easier. I used three design specs in this problem.

leanna
Download Presentation

DS-2 controls the flow in the feed stream to give 75 MW

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Note that I broke the recycle after the boiler. While not really necessary, it does make life easier. I used three design specs in this problem. The closed feed water heater was specified to have condensate (from the extraction port --vapor fraction =0) leaving the heater. DS-1 then controls the split to give the 5 C difference between the condensate and the boiler feed water. DS-2 controls the flow in the feed stream to give 75 MW DS-3 controls the split from the second extraction port to give a zero heat duty in the flash tank which I used as the open feed water heater. By specifying 0 vapor fraction, the flash model computes the heat duty necessary to have all inputs leave as a liquid. DS-3 then controls the split to give a zero heat duty. The result of all this is an overall thermal efficiency of just over 32 %

More Related