PROCESS IMPLEMENTATION FOR Wabco Crank Case 911 905 0106 (ISB) . Before modification - 1) Manually removes the unbaked sand at the center of core for plug. 2) Extra man power required for sand removing (2 no. of workers,125 no. of core produced.) 3) Inside core baking not properly. .
E N D
PROCESS IMPLEMENTATION FORWabco Crank Case 911 905 0106 (ISB)
Before modification -1) Manually removes the unbaked sand at the center of core for plug.2) Extra man power required for sand removing (2 no. of workers,125 no. of core produced.) 3) Inside core baking not properly.
Core Box core cavity Loose Piece Inserted Before Work. After Work. New loose piece inserted.
After Modification. Manually removes the unbaked sand totally avoided Extra worker totally avoided. Totally 02 worker Saved Core required Quantity 500 nos produced & 8 workers Saved. Core weight reduced by 700 gm.Old Core Weight 2.720 Kg Modified Core Weight 2.0Kg
Wabco Crank Case 911 905 0106 After Implementation Before Implementation
Before Work After Work.