1 / 31

Con Edison Case Study: Recent Plastic Fusion Orders

Con Edison Case Study: Recent Plastic Fusion Orders. Lauren Toczylowski Section Manager, Gas Quality Assurance. Agenda. Con Edison Distribution Overview Plastic Fusion Remediation Plan New NY State requirements Tracking & Traceability approach Ongoing Fusion Inspections

least
Download Presentation

Con Edison Case Study: Recent Plastic Fusion Orders

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Con Edison Case Study: Recent Plastic Fusion Orders Lauren Toczylowski Section Manager, Gas Quality Assurance

  2. Agenda • Con Edison Distribution Overview • Plastic Fusion Remediation Plan • New NY State requirements • Tracking & Traceability approach • Ongoing Fusion Inspections • Required Enhancements • Tracking & Traceability approach • Other Plastic Joint Enhancements • Ongoing Tracking & Traceability Projects

  3. Con Edison Distribution Overview • Distributes natural gas to 1.1 million customers in Manhattan, the Bronx, Queens, and Westchester County • ~ 4,300 miles of gas mains and ~384,000 services transport about 225 billion cubic feet a year • Most of our customers use gas for cooking and ~221,000 also use gas for residential heating

  4. Con Edison Distribution Overview

  5. Organizational Structure

  6. Fusion Compliance Requirements History • September 29, 2014: Con Edison, and other NY LDCs required to submit a remediation plan • October 31, 2014: Con Edison, and other NY LDCs, submitted plans to be completed within one year • November 17, 2014: Con Edison’s original plan deployed, to be complete by November 1, 2015 • December 2014 – May 2015: Discussion with DPS Staff re: plan • May 15, 2015: PSC Orders Con Edison to submit revised plan. Also orders NY LCDs to: • Peer check 100% of all new fuses being installed • Visually inspect all fuses exposed during the course of normal business • August 2015: Excavations under new plan begin

  7. Plastic Fusion Remediation Plan

  8. Overview of Plastic Fusion Sampling Plan • Population: ~805,000 fuses installed in 2002-2014 • Conduct statistical approach to identify samples to be inspected • Fuses/fusers were not previously documented, but segments were mapped • A sub-set of pipe segments were randomly selected • Fuses were then mapped and labeled for each segment selected • Statistician’s analysis includes strata for each type of segment (main or service), geographic areas (Bronx, Queens, Manhattan, Westchester), and each type of fuse (butt fuse, electrofusion and sidewall tee) • 200 fuses will be inspected to determine whether additional sampling is needed to develop a remediation plan

  9. Inspection Form: Visual Inspection & Destructive Test

  10. Field Documentation • Tag sample to indicate: • Location (house address & borough) • Size of pipe • Date removed • Supervisor name • Piping Retrieval Information Form • Filled out for each sample length

  11. Inspection/Testing Photos & Videos

  12. Manual Data Conversion for PSC Reporting

  13. Multiple Documents & Files for One Fuse • Hand written forms • Pipe tags • Visual Inspection Results Data • Destructive Test Results Data • Multiple Photos • Video file • Spreadsheet entries • Letters to PSC

  14. Solution: Integrated Mobile Data Capture • Application deployed on ruggedized smart phones and tablet computers • Real-time data transfer from field to office to field • Centralized repository with robust reporting capability • Cloud computing/ hosted options

  15. In The Field

  16. Automated PSC Reporting

  17. New Fuse Peer Inspection & Exposed Fuses Visual Inspections NY State May 15th Order

  18. Con Ed Preparation for Additional Inspections • Needed to train and qualify additional employees/contractors to perform visual inspections • Developed and deployed additional training • Used a Written Evaluation (equivalent to NGA CT#52) developed by Con Edison • Qualified additional employees and contractors to perform visual inspections of plastic joints

  19. Field Documentation Identifying PE Plastic Joiner and Inspector • Plastic joints are identified on as-constructed drawings • Fuser and Peer Inspector are signing the pipe • Each plastic joint is documented • Data captured: • Job information (M&S plate #, Ticket/Leak #, Location , Layout #) • Plastic Joiner employee/ID # • Peer Inspector employee/ID # • Date Plastic Joint made • Joint Type ( Butt Fusion, Electrofusion, Mechanical Joint)

  20. Peer Check of All New Fuses

  21. Fuse-to-Fuser Application

  22. Fuse-to-Fuser Application

  23. Other Plastic Joining Enhancements

  24. Ongoing Enhancements in Plastic Joining • Annual OQ: block requalification with 3rd party evaluators • Online OQ system: eLearning, online testing and QR codes • Level 1/Level 2 inspections of new fuses • Remediation Options for visually unacceptable fuses • Elimination of the Sidewinder • Enhanced QA/QC Programs • NTSB Recommendations for Specification Improvements • R&D Projects: • Heat Fusion Processes • GPS Devices

  25. Butt Fusion Remediation Sleeve

  26. PE Repair Patch

  27. Additional QC: Fusion Inspections • Created a separate GQC group • Hired a 3rd party inspection contractor • Fusion inspectors in the field, making process observations • Field visits where ongoing fusions are taking place • All GQC inspectors are fusion qualified • Level 1/ Level 2 Fusion Inspections

  28. Analyzing Inspection Results • Large amount of data around fusion inspections and quality • Analyzing and reporting on results • Common issues identified and addressed: • Damaged Butt Fusion Plates (replacement program) • Alignment of Electrofusion (new tools identified) • Scraping of Pipe Surface (1” past fusion area)

  29. Tracking & Traceability R&D • IT Roadmap Project: analyzing GIS and WMS solutions • Trimble R&D Project: • Handheld Trimble and smart device connections • Testing in areas with Urban Canyons and Tree Canopy issues • Comparing usability with other smart device applications

  30. Thank You Any Questions?

More Related