1 / 8

Comitato di Studio B3 - Substation

Comitato di Studio B3 - Substation. Cigré Session 2010. 43 ma Sessione Generale Cigré Parigi, 20 - 24 Agosto 2010. Daris Falorni Membro italiano SC B3. Latina, 24 novembre 2010. 1. 1. Comitato di Studio B3 - Substation. Indirizzi emersi

lee-sears
Download Presentation

Comitato di Studio B3 - Substation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Comitato di Studio B3 - Substation Cigré Session 2010 43ma Sessione Generale Cigré Parigi, 20 - 24 Agosto2010 Daris Falorni Membro italiano SC B3 Latina, 24 novembre 2010 1 1

  2. Comitato di Studio B3 - Substation • Indirizziemersi • Nuoveconcezioniprogettuali e costruttive delle stazionielettriche • Problematiche relative all’esercizio delle stazionielettriche • Gestionedelciclo di vita dei componenti • Impatto dei nuovi standard di comunicazione e Smart Grids nelle stazioni elettriche Latina, 24 novembre 2010

  3. Comitato di Studio B3 - Substation • Integrazione in TC Projects • Dall’informativatrasmessa in occasionedell’ultimoincontrodel SC B3, risulta un interesse sui seguentitemi: • The Network of the future • UHV • GIL Latina, 24 novembre 2010

  4. Comitato di Studio B3 - Substation Gruppi di lavoro B3attuali SC Chairman Strategic Advisory Group SAG SC Secretary Customer Advisory Group CAG Tutorial Advisory Group TAG AA1 Concepts and Developments AA3 Air Insulated Substations AA4 Substation Management AA2 Gas Insulated Substations SC B3.12 Obtaining Value from Substation Condition Monitoring SC B3/B1.27 (not yet approved) Economical Aspects of GIL and Underground Cables SC B3.21 Turnkey Substation SC B3.06 Substation Management SC B3.13 Reducing Replacement Time of HV Equipment SC B3.17 Residual Life Concepts Applied to HV GIS SC B3.23 Guidelines for Uprating and Upgrading of Substations SC B3.10 Primary/Secondary System Interface Modelling for Total Asset Performance SC B3/C1/C2.14 Circuit Configuration Optimisation SC B3.18 SF6 Tightness Guide • Membership: • 24 regularmembers of the SC • 12 observer members of the SC • > 260 active working group members SC B3.26 Guidelines for the Design and Construction of AC Offshore Windfarms SC B3.25 SF6 Analysis for AIS,GIS, MTS Condition Assessment Latina, 24 novembre 2010

  5. Comitato di Studio B3 - Substation Gruppi di lavoro B3in chiusura SC Chairman Strategic Advisory Group SAG SC Secretary Customer Advisory Group CAG Tutorial Advisory Group TAG AA1 Concepts and Developments AA3 Air Insulated Substations AA4 Substation Management AA2 Gas Insulated Substations SC B3.12 Obtaining Value from Substation Condition Monitoring SC B3/B1.27 (not yet approved) Economical Aspects of GIL and Underground Cables SC B3.21 Turnkey Substation SC B3.06 Substation Management SC B3.13 Reducing Replacement Time of HV Equipment SC B3.17 Residual Life Concepts Applied to HV GIS SC B3.23 Guidelines for Uprating and Upgrading of Substations SC B3.10 Primary/Secondary System Interface Modelling for Total Asset Performance SC B3/C1/C2.14 Circuit Configuration Optimisation SC B3.18 SF6 Tightness Guide SC B3.26 Guidelines for the Design and Construction of AC Offshore Windfarms SC B3.25 SF6 Analysis for AIS,GIS, MTS Condition Assessment Latina, 24 novembre 2010

  6. Comitato di Studio B3 - Substation Gruppi di lavoro B3 di recenteformazione SC Chairman Strategic Advisory Group SAG SC Secretary Customer Advisory Group CAG Tutorial Advisory Group TAG AA1 Concepts and Developments AA3 Air Insulated Substations AA4 Substation Management AA2 Gas Insulated Substations SC B3.12 Obtaining Value from Substation Condition Monitoring SC B3/B1.27 (not yet approved) Economical Aspects of GIL and Underground Cables SC B3.21 Turnkey Substation SC B3.06 Substation Management SC B3.13 Reducing Replacement Time of HV Equipment SC B3.17 Residual Life Concepts Applied to HV GIS SC B3.23 Guidelines for Uprating and Upgrading of Substations SC B3.10 Primary/Secondary System Interface Modelling for Total Asset Performance SC B3/C1/C2.14 Circuit Configuration Optimisation SC B3.18 SF6 Tightness Guide SC B3.26 Guidelines for the Design and Construction of AC Offshore Windfarms SC B3.25 SF6 Analysis for AIS,GIS, MTS Condition Assessment SC B3.29 Field tests technology on UHV substation during construction and operation SC B3.30 Guide to minimize the use of SF6 during testing of electrical equipment Latina, 24 novembre 2010

  7. Comitato di Studio B3 - Substation • TemiprincipaliSessione 2012 • Studio distazionielettrichecheconsentanol’integrazionenelle “Smart Grid” • Ruolo della stazione elettrica di alta tensione nella realizzazione delle “Smart Grid” • Gestione della stazione elettrica per consentire la realizzazione di “Smart Grid” • Automazione della stazione elettrica e sistemi di comunicazione • Sviluppifuturidellestazionielettriche • UHV (1100-1200 kV) • Stazioni “Offshore” • Stazionidiconversione “AC/DC” • Ottimizzazione della superficie destinata alle stazioni elettriche Latina, 24 novembre 2010

  8. Comitato di Studio B3 - Substation Grazie per l’attenzione Latina, 24 novembre 2010

More Related