An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Demand Side Working Group Updateto WMSJanuary 16, 2008 Mary Anne BrelinskyEagle Energy Partners

  2. Demand Side Working Group Agenda

  3. Chair and Vice Chairs for 2008 • Need WMS to affirm Chair and Vice Chairs for 2008: • Affirm Mary Anne Brelinsky as Chairman • Represents Lehman Brothers (REP/QSE) • Affirm Nelson Nease as Co-Vice Chair • Represents Nucor Steel (Industrial User) • Affirm Timothy Carter as Co-Vice Chair • Represents Constellation New Energy (REP/QSE)

  4. 2008 DSWG Goals

  5. LaaR Event Summary Sequence of Events and System Summary: • ERCOT System loses about 1022 MW of Generation Resources at about 01:49 • Triggers a potential NERC Reportable DCS Event • ERCOT Operator makes a hot line call to all QSEs and issues a VDI to deploy all LaaRs that are supplying RRS • Ten QSEs have LaaR RRS obligations which total 1150 MW • Official start time for the deployment is 01:56:22 which coincides with the end of the Operator’s Instruction • System LaaR Response at 10 minute mark is 1051 MW • LaaRs reach 95% of system requirement at 16 minutes 20 seconds

  6. LaaR Event December 12th: Deployment Timeline

  7. LaaR Load Shead

  8. Schedule Meetings for 2008 • The next two DSWG meetings for 2008 are currently scheduled on: • Friday March 7th • Friday May 9th