1 / 15

62nd GRPE agenda item 3 (a) WLTP WLTP secretary – Noriyuki Ichikawa GRPE chair - Christoph Albus

62nd GRPE agenda item 3 (a) WLTP WLTP secretary – Noriyuki Ichikawa GRPE chair - Christoph Albus. Discussion points – agenda item 3 (a) - WLTP. 1. WLTP – organisational issues 2.1. DHC – test cycle development 2.2. DHC – validation phase 1 3.1 DTP – measurement procedure development

leenancy
Download Presentation

62nd GRPE agenda item 3 (a) WLTP WLTP secretary – Noriyuki Ichikawa GRPE chair - Christoph Albus

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 62nd GRPE agenda item 3 (a) WLTP WLTP secretary – Noriyuki Ichikawa GRPE chair - Christoph Albus

  2. Discussion points – agenda item 3 (a) - WLTP 1. WLTP – organisational issues 2.1. DHC – test cycle development 2.2. DHC – validation phase 1 3.1 DTP – measurement procedure development 3.2 DTP – validation phase 2 4. Next steps 5. Miscellaneous

  3. Discussion points – agenda item 3 (a) - WLTP 1. WLTP – organisational issues 2.1. DHC – test cycle development 2.2. DHC – validation phase 1 3.1 DTP – measurement procedure development 3.2 DTP – validation phase 2 4. Next steps 5. Miscellaneous

  4. WLTP – organisation & coordination In June 2010 (GRPE & WP.29) it was decided to proceed further under the framework of the 1998 agreement (GTR development), but to undertake a re-assessment in June 2011 It was also decided to freeze the activities of the WLTP informal group, to concentrate on the work of the sub groups DHC and DTP, and to deal with heading and coordinating issues during the proper GRPE sessions in 2011

  5. WLTP – organisation & coordination • Conclusions from the last 12 month: • Very good progress in work of the two sub groups DHC and DTP • Lack in organisation and coordination of WLTP work • (e.g. definition of responsibilities, drafting of the gtr text, planning of validation, preparation of GRPE and WP.29 decisions, …)

  6. WLTP – organisation & coordination Three options: 1) No change 2) Reactivation of the WLTP informal group 3) Establishment of a steering group

  7. WLTP – steering group - members WLTP sponsor Japan (Kazuyuki Narusawa) WLTP sponsor EU (Klaus Steininger) WLTP secretary (Noriyki Ichikawa) DHC chair (Hajime Ishi, (Chris Parkin)) DTP chair (Giovanni D’Urbano) OICA (William Coleman) Drafting coordinator (tbd) Validation 2 coordinator (Alessandro Marotta) GRPE chair (Christoph Albus)

  8. WLTP – steering group - ToR No chair – everybody can start activities and initiatives Transparency Preparation of WLTP documents  UNECE website Clarification of responsibilities (who, what, deadlines) Organisation of the WLTP project process(timing, information flow, coordination)

  9. WLTP – steering group - ToR The role of DTP and DHC will not change. The steering group should not be understood as an additional level between GRPE and DTP/DHC. The main purpose is to supervise and support all WLTP activities and all sub groups permanently

  10. WLTP – overall structure WP.29 GRPE steering group DTPincl. validation 2 coordination draftingmanager /group DHC 5 DTP sub groups

  11. Confirmation by GRPE ? Three options: 1) No change no 2) Reactivation of the WLTP informal group no 3) Establishment of a steering group yes

  12. WLTP – Documents GRPE working & informal documents steering group WLTP – UNECE website drafting group WLTP – UNECE website TFV WLTP – DHC – DTP – UNECE website DHC DHC – UNECE website DTP DTP – UNECE website 5 DTP subgroups circa website (European Commission) link on UNECE website

  13. WLTP – drafting coordinator (manager) Very urgent to find a person, responsible for the coordination of the gtr drafting(including drafting of the Technical Report) Many text modules for draft gtr already exists Definitions – a consistant and suitable system needs to be developed Status: European Commission is preparing a contract, but time delay because of administrative problems

  14. WLTP – coordination of the validation process It was discussed by the steering group whether we need an overall coordination of validation phase 1 & 2, confirmation testing and round robin For the time beeing it was decided that there is a need for coordination only for validation phase 2, in close cooperation with DTP group Possible candidate is Alessandro Marotta (JRC), but final confirmation from the European Commission is outstanding Establishment of a validation 2 task force (VTF)

  15. Discussion points – agenda item 3 (a) - WLTP 1. WLTP – organisational issues 2.1. DHC – test cycle development 2.2. DHC – validation phase 1 3.1 DTP – measurement procedure development 3.2 DTP – validation phase 2 4. Next steps 5. Miscellaneous

More Related