80 likes | 208 Views
SCS opened. Makassar passage. total. upper 1250m. 1250m to bottom. Lifamatola passage. Depth averaged circulation (SCS opened). Winter (DJF). Summer (JJA). 0-1250m averaged circulation (SCS opened). Winter (DJF). Summer (JJA). 1250-bottom averaged circulation (SCS opened).
E N D
SCS opened Makassar passage total upper 1250m 1250m to bottom Lifamatola passage
Depth averaged circulation (SCS opened) Winter (DJF) Summer (JJA)
0-1250m averaged circulation (SCS opened) Winter (DJF) Summer (JJA)
1250-bottom averaged circulation (SCS opened) Winter (DJF) Summer (JJA)
SCS blocked Makassar passage total upper 1250m 1250m to bottom Lifamatola passage
Depth averaged circulation (SCS closed) Winter (DJF) Summer (JJA)
0-1250m averaged circulation (SCS closed) Winter (DJF) Summer (JJA)
1250-bottom averaged circulation (SCS closed) Winter (DJF) Summer (JJA)