General Intro O.Hainaut Restructuring & New structure First class operation: Welcome to the RITZ Operation Engineers and TIOs P. Le Saux Reports from the Instrument Forces Imaging Instrument Force R.Mendez Spectro Instrument Force E.Pompei/J.Pritchard
E N D
General Intro O.Hainaut Restructuring & New structure First class operation: Welcome to the RITZ Operation Engineers and TIOs P. Le Saux Reports from the Instrument Forces Imaging Instrument Force R.Mendez Spectro Instrument Force E.Pompei/J.Pritchard High-Res Spectro Instrument ForceJ.Pritchard InfraRed Instrument Force M.Sterzik/V.Doublier La Silla Science Operation Department
Restructuring • Jan-Jun 2002: Re-engineering ~10 meetings, 150 emails 5 major documents • SciOp Plan • Structure • Staffing Plan • Astro Plan • Operation • Communication • Jul.1, 2002: NTT+360Cat+2p2Team = SciOp
SciOp 2002 • = Telescopes: • NTT + 3.6m + 2.2m • (+ 1.5Dk, 1.5ESO, 1m, DIMM) • = People • 15 TIOs + 2 TIOs (1.5m) + 1 TIO (1m) • 2 Operation Engineers, • 16 Astros (5staff, 4OpA, 7Fellows)
SciOp Long-Range • 2003: transition (WFIVST@Paranal) • > 2003 • Telescopes: • NTT with SuSI2, SofI, EMMI/EMMI2 • 3.6m with TIMMI2, EFOSC, CES, HARPS • 2.2m with WFI, FEROS, (Grrr?) • DIMM • People: • 12 TIOs • 2 OpEng • Astro: 4 Staff, 3 OpA, 3 Fellows
SciOp Structure • Administrative • Astro, TIOs (2 turnos), OpEng • Technical • Instrument Forces: • InfraRed: TIMMI2, SofI • Imaging: WFI, SuSI2 • Spectro: EFOSC2, EMMI • HiRes: FEROS, EMMI/Ech, CES, HARPS • CONTACT: • Shift Leader: lasilla@eso.org • All SciOp: ls-sciops@eso.org
The RITZ La Silla(Remote Integrated Telescope Zentrum) • Offices: • 1.5 ready • +2.5 soon • Telescope Control • NTT: Oct.2002 • 2.2m: Dec.2002 • 3.6m: Feb.2003