1 / 2

Transition from CVS to SVN

Transition from CVS to SVN. Zeuthen ILC software repository is being transferred from CVS to new system : “subversion” ( SVN ), to prepare for shutting down CVS (long term plan) All repositories have already been copied, preliminary info: http://svnsrv.desy.de

leland
Download Presentation

Transition from CVS to SVN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Transition from CVS to SVN • Zeuthen ILC software repository is being transferred from CVS to new system: • “subversion” (SVN), to prepare for shutting down CVS (long term plan) • All repositories have already been copied, preliminary info: http://svnsrv.desy.de • Repositories can be viewed via a web-interface: https://svnsrv.desy.de/viewvc • and also accessed using the CLI svn, e.g. • svn list https://svnsrv.desy.de/public/marlin (public access) • svn list https://svnsrv.desy.de/svn/marlin (write access) • All developers for LCFIVertex and tagnet repositories (Erik Devetak, Mark.Grimes • Kristian Harder, SH, Talini Pinto Jayawardena, Ben Jeffery, Tomas Lastovicka, Victoria Martin, • Roberval Walsh) should have received emails about this and ought to register with • the new system as described in these emails (i.e. contact Wolfgang Friebel with • your GRID certificate DN)

  2. ILD mass production: signal samples • ILD MC mass production is progressing well (cf Roberval’s report from ECFA workshop) • Mark Thomson is therefore requestinginput for deciding on the near term priorities; • people planning physics studies for the ILD LoI should provide estimates of • (signal) samples needed • number of events • details of MC generation of four vectors (generator settings) • Please contact Mark a.s.a.p. with any requests, so that balanced priorities can be • found for the generation of signal and of SM background samples as well as the • reconstruction

More Related