Net Metering July 19, 2012

Net Metering July 19, 2012. Agenda. Net Metering Background Eligibility Enrollment and setup process Meter Exchanges Termination EDI 867 monthly usage data. Net Metering Background.

len
Download Presentation

Net Metering July 19, 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Net Metering July 19, 2012

  2. Agenda • Net Metering Background • Eligibility • Enrollment and setup process • Meter Exchanges • Termination • EDI 867 monthly usage data

  3. Net Metering Background • Illinois Public Utility Act (Act) Section 16-107.5 established Net Metering and made it available to customers who operate eligible Renewable Electric Generating Facilities; 1) in parallel with ComEd’s distribution system, and 2) intend to use the generation on primarily to offset their own electrical requirements. • Rider POGNM provides customers with net metering in accordance with the Act and in compliance with 83 Illinois Administrative Code Part 465. See link to ComEd’s Tariffs: • https://www.comed.com/Documents/customer-service/rates-pricing/rates-information/current/Ratebook.pdf • Under Rider POGNM the customer may receive credit on their electricity bill for the excess electricity generated according to the terms of the Net Metering Agreement. • Rider POGNM has 6 categories, the following 3 are applicable to RES supplied customers: • NM 3 = Not Competitively Declared on Rate RDS with RES supply with pricing that is not hourly • NM 4 = Not Competitively Declared on Rate RDS with RES supply with hourly pricing • NM 6 = Competitively Declared on Rate RDS with RES supply with hourly prices

  4. Eligibility • Residential or Commercial customers who own or operate an on-site eligible renewable generation resource of up to 2 megawatts are eligible. • Types of eligible generators: • Solar • Wind • Dedicated crops grown for electricity generation • Agricultural residues • Untreated and unadulterated wood waste • Landscape trimmings • Livestock manure • Anaerobic digestion of livestock or food processing waste • Fuel cells or microturbines powered by renewable fuels • Hydroelectric

  5. Enrollment and Setup Process Steps in Net Metering process: • ComEd net metering customer switches to a supplier • Customer is removed from ComEdNet Metering program, termination letter sent to customer • Customer notifies RES it wishes to enroll in the supplier’s net metering program • RES sends Net Metering Notification form to the ESSD mailbox • ESSD sends Notification form to ComEd Net Metering Program Manager • Program Manager reviews the request and sends customer ComEd Net Metering Election Form • Customer completes the Election Form and sends to the Program Manager • Program Manager approves request (if new project), makes meter exchange request (if required), notifies System Billing to add the Net Metering contract onto the customer’s account • System Billing places account on pull bill (if it’s likely customer will over generate) and notifies ESSD • ESSD notifies RES the Net Metering contract has been added to the account • RES notifies customer • Note: Customers will not have to reapply each year. The agreement will continue until customer switches to another RES or to ComEd • If customer installs a renewable energy system while taking supply from a RES, customer starts process by notifying RES it wishes to enroll in supplier’s net metering program • RESs Responsibilities • Send Net Metering Notification Form • Form notifies ComEd if customer is on TOU or fixed price supply and if the annual period is April or October

  6. Meter Exchanges Meter Exchanges: • If Project Manager believes customer will over generate a dual channel meter will be installed • The RES may be responsible for paying for the meter exchange • Prices for meter exchanges vary per field trip, per meter, per meter type • Costs range from $74.04 to $219.43 (subject to change) • Table 1 summarizes meter exchange and cost information for each category

  7. Table 1. Rider POGNM - Description of Categories 1) Applies ifcustomer requires a meter exchange

  8. Termination The Net Metering agreement can be terminated for the following: • Changes or modification of generating equipment • Customer finals their service at their premise • Customer drops back to ComEd • Customer goes from RES to another RES • Customer elects to terminate (customer is responsible for notifying the RES at least 30 days prior to termination) • If RES drops or customer terminates, the customer will lose their kWh based credits, as applicable

  9. 867 Monthly Usage Data Net metering customers who never over generate: • The value in the summary loop of the 867 will match the sum of the half-hour intervals • The summary loop value represents energy delivered Some net metering customers “over generate”: • In a given interval they might put more energy out to the grid than they consume • If a net metering customer generates more than it uses in any half-hour interval: • For half-hour intervals when output exceeds input the usage value in the 867 will be negative • Summing the intervals will produce the net usage for the account • The value in the summary loop of the 867 will not match the sum of the half-hour interval data If a net metering customer has dual channel metering: • The account will be manually billed by System Billing

  10. Wrap Up • Questions and Answers • Your feedback • If there are any questions we did not cover in the presentation or the Q & A, your ESSD Account Manager will follow-up