1 / 18

Mr. Roy Deda DPM Chicago District May 18 th , 2011

2011 Midwest Small Business Government Contracting Symposium. GLFER:. Burnham Prairie. Mr. Roy Deda DPM Chicago District May 18 th , 2011. Chicago District. The Chicago District provides engineering services and capabilities vital to

lena
Download Presentation

Mr. Roy Deda DPM Chicago District May 18 th , 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2011 Midwest Small Business Government Contracting Symposium GLFER: Burnham Prairie Mr. Roy Deda DPM Chicago District May 18th, 2011

  2. Chicago District • The Chicago District provides engineering services and capabilities vital to • Reducing the impacts of storm and flood damage, • Protecting and restoring the environment, • Supporting navigation, and • Responding to national emergencies. Great Lakes and Ohio River Division 8 Counties (IL – 6; IN – 2); 5,000 Sq. Mi.; 8.5 Million people

  3. FY 10 Expenditures: $186M Construction Placement represents 80% of FY10 Expenditures

  4. Budget Trends

  5. Small Business Performance FY 11 Actual based on performance through 6 May 2011

  6. FY 10 Contracts

  7. FY 10 Contracts

  8. Ecosystem Restoration

  9. Planned FY11 Advertisement Schedule Great Lakes Fishery Environmental Restoration Program (GLFER)

  10. Planned FY11 Advertisement Schedule Ecosystem Restoration / Environmental Infrastructure

  11. Flood Risk Management

  12. McCook Reservoir Underground Storage Main Tunnel Access Shaft Stage 2 Grout Curtain • FY 11 Construction: • Complete Main Tunnel System • Access Shaft and Gates • fabrication • Continue Stage 2 Grout Curtain • Initiate Main Tunnel • FY 12 Construction: • Completion of Stage 2 Grout • Continue Main Tunnel • 30,000 acre-ft Reservoir (10 billion gal) • 1 of 2 Tunnels complete • Pumps & motors finished • Gates and valves, Aeration system • Scheduled Completion: Phase 1 (2016), • Phase 2 (2023)

  13. Little Calumet River • 22 miles of levees & floodwalls, control structures & pump stations • Preserve 500 acres of wetlands • Provides recreation features • Approximately 90% constructed, Est. Completion - 2015 Stage V-2 Levee Pump Stations Levee, Stage VIII Levee, Stage VII Pump Station 2B • Current Construction: • Stage V-2 Levees • Stage VII Levees • Stage VIII Levees • Future Construction: • Southmoor Floodwall (Jun 11) $1 - $5M RFP Unrestricted • West Tie Back Levee Hammond ( Aug 11) $1- $5M • RFP Unrestricted

  14. Planned FY11 Advertisement Schedule Flood Risk Management

  15. Navigation

  16. Planned FY11 Advertisement Schedule Navigation / Operations & Maintenance (O&M) / Dredging

  17. A/E Contracts

  18. Conducting Business With Us Chief of Contracting: Ms. Regina Blair (312) 846-5371 Deputy for Small Business: Ms. Priscilla Abeyta-Perez (312) 846-5565 https://www.fbo.gov/ In the “Keyword/Solicitation #” box Enter : W912P6 and hit Search COLLECT $$$ AS YOU CONDUCT BUSINESS WITH USACE

More Related