An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. chapter 14 Network and Project Management Outline Telecommunications systems analysis and design methodology – assist in developing, implementing, and operating data networks Need for qualified personnel – review of several professional certification programs

  2. Introduction • Management of telecommunications, like the management of an organization Figure 14.1 – Mission, Operating Philosophy and Vision

  3. Telecommunications Design and Implementation • Change is the constant in a business. • All changes will require network analysis and design: • Determining needs • Analyzing alternatives • Delineating system specifications • Designing the system • Computer-based or management information systems (MIS). • Maturity of the systems and analysis process and methodology of MIS

  4. Network Analysis, Design and Implementation • Network analysis and design - process of: • Understanding the requirements for a communication network • Investigating alternative ways for implementing the network • Selecting the appropriate alternative to provide required capacity • Network implementation - process of: • Installing • Making the network operational

  5. Sources of Request for Projects • Reasons for projects: • Better and more cost-effective ways of doing the present jobs • Present capabilities being taxed to their limits • Worn-out equipment being called upon to perform too long • Enhancements and additions to make sure that the present service is: • Adequate • Cost-effective • Reliable

  6. Sources of Request for Projects (cont’d) • People closest to operations know the most about their operations and processes. • They must understand the business needs or the logic as a starting point. • Senior managers must consider long-term concerns. • Demands arise from the needs of: • Customers • Technology vendors • Governmental agencies

  7. Capabilities • Process of design and development of new capabilities follows a formal development process • Creating and maintaining telecommunications systems – based on systems development life cycle (SDLC) • Phases include: • Feasibility • Systems analysis • Design • Procurement • Implementation • Test evaluation and review • Maintenanceand change

  8. Network Modeling • Diagrammatic technique – employed to document the system in terms of the users, data, and processing locations • Modeling of the network requirements independent of the actual implementation. • Process of design - converts to implementation models • Refer to modeling figure in the text.

  9. Phases of Telecommunications Analysis and Design • The request • Problem definition stage • Might be written down to make it formal • Each phase is discussed in detail

  10. Phases I • Problem identification, definition and objective statement • Begins with a statement of the problem, opportunity, or threat at hand • Group must identify, discuss, and describe the problem, threat, or opportunity and propose a solution • Team composition includes: • Team leader • Technical specialist(s) • Interested users • Telco and IXC representatives • Consultant

  11. Phases I (cont’d) • Risk analysis and management • Security risk - physical, virtual and data security • Preliminary determination of requirements: • What is the purpose of this project? • How many nodes are to be connected? • What is the volume of traffic between nodes? • What is the mix of voice and data usage? • How time-sensitive are the messages transmitted? • Can you create the solution with existing bandwidth, or do you need to create new bandwidth? • What is the risk to the total telecommunications capability of adding or not adding this project? • Geographic dispersion of nodes must be considered

  12. Phase II • Preliminary investigation and feasibility study • Deals with whether one can and should do the project • Technical feasibility • Behavioral feasibility and implications • Economic feasibility • Operational feasibility • Time feasibility • Regulatory feasibility • Ethical feasibility • Project management • Control the progress, resources, and cost of the program

  13. Phase III • Systems analysis – detailed understanding and definition • System specification • Prototyping • Simulation • Make-or-buy decision • Architecture • Planning • Physical placement of equipment • Installation of the media • Documentation • Training • Testing

  14. Phase IV • Investigation of alternatives • Is the change to be an expanded capability or a new capability? • Can the network accommodate the addition, will enhancements be required, or will a new network be required? • Can we lease part of the enhancement, must we build it all in-house, or can we contract it out to a third party (make-or-buy)? • Are there alternatives in media? Does the consideration of growth potential (reserve) impact this choice? • What are the cost and schedule implications for each alternative? • Will the cost fit the budget and required return on investment?

  15. Phase V • General network design • Design of the new system, based on the requirements gathered during the system’s analysis stage • Involves the creation, on paper, of the system’s parts and interactions • Physical circuits and logical channels • Availability and response • Capacity • Human resources, skills required, and sources • Training required and sources • Location of equipment and requirements • Maintenance requirements

  16. Phase VI • Selection of vendors and equipment • Equipment and software must be obtained from vendors. • Requests for proposal (RFP) • Request for quote (RFQ) • Surveys published by Network Magazine and Infoworld. • Technical response to be rated on engineering merits, capability, reliability • Vendors to be rated on maintainability, experience, reliability, and reputation

  17. Phase VII • Calculation of costs • The following must be considered for the estimation of approximate costs: • Hardware: Procured hardware, media, and upgraded hardware • Software • Personnel • Supplies: Installation and ongoing • Maintenance • Conversion (from existing systems)

  18. Phase VIII • Presentation to technical and management group on recommendation: • Once all alternatives and vendors have been rated, management groups will likely take a final call. • Technical and business managers must both be involved. • Senior management, not the engineers, need to make the final decisions.

  19. Phase IX • Final decisions and design • Finalization of design based on decision • New facilities • An inventory of the prospective new facilities and capacities • Preparation is made for the arrival of new equipment • Implications must be understood fully

  20. Phase X • Procurement order – hardware, software and services • Creation of purchase orders for products and/or services • Might be provided by the: • Parent organization • A person in the administrative department of the telecommunications or the MIS group

  21. Phase XI • Preparation for implementation • Space • Cooling • Electrical power • Lighting • Safety

  22. Phase XII • Installation of equipment • Acceptance testing • Attachment to the media • Testing of each interface upon installation

  23. Phase XIII • System testing • Tested as an entity – test plan and test data are required • Point-to-point and then end-to-end connectivity is checked. • Determine bottlenecks • Level of queuing • Balking • System’s ability to handle heavy workload • Comply with FCC, Underwriters Laboratory (UL) and the local electrical, structural and electromagnetic standards

  24. Phase XIV • Training • The telecommunications group must be aware of the updates and their applications. • Telecommunications library. • Training in-place at the vendor’s site

  25. Phase XV • Implementation • Production status, available to the users • Maintenance, reliability, and back-up • Cutover: depending on the extent of enhancements and additions, the telecommunications group can use: • Pilot • Parallel • Phased • Phase-in, phase-out and modular • Cold turkey

  26. Phase XVI • After-implementation cleanup and audit • Place what is not in use in inventory and audit performance • Learn from experience. • Complete review of project and present findings to technical and business management. • The new system description must be incorporated into the configuration database • Portfolio update

  27. Phase XVII • Turning system over to maintenance group • Implementation and acceptance of the system • Correction of problems and exploration of new possibilities • System component enhancement is likely during this phase.

  28. Certification • Certification – paper-qualified person • Network administrator – level of achievement, surrogate for experience • Understanding the care of simple hubs to deploying routers and broadband channels • Initial filter for prospective employees – ceteris paribus. • Progression of individuals • New hires and experienced hires – network administration • Experienced hires – invaluable, short in supply, require higher salaries

  29. Certifications Available • Network Overview - CompTIA’s Network+: CompTIA A+ through Microsoft MCSE and Novell CNE • Hardware – CompTIA’s A+ • Microsoft • Microsoft Certified Professional (MCP) • Microsoft Certified Systems Administrators (MCSA) • Microsoft Certified Systems Engineers (MCSE) • Cisco • Cisco Certified Network Associate (CCNA) • Also offers CCIE, CCDA, CCNP, CCDP, CCIP, CCSP and CCVP

  30. Certifications Available (cont’d) • Novell • Certified Novell Administrator (CAN) 5/6 • Certified Novell Engineer (CNE) • Linux • CompTIA’s Linux + • Red Hat Certified Engineer (RHCE) • Novell Certified Linux Professional (Novell CLP) • Linux Professional Institute’s LPIC1 – Junior Level Administration • Linux Professional Institute’s LPIC2 – Intermediate Level Administration • SAIR’s Linux/GNU Certified Engineer (LCE)

  31. Certifications Available (cont’d) • Internet • CompTIA’s i-Net+ • Security • CompTIA’s Security+: Cryptography, authentication, etc. • ISC2 SSCP, CISSP and SANS GIAC • SANS Institute Global Information Assurance Certification (GIAC) – SANS Global Incident Analysis Center • GIAC IT Security and Audit Essentials

  32. Certifications Available (cont’d) • Certified Information Systems Security Professional (CISSP) • Master’s Degree in Information Security from a National Center of Excellence • Systems Security Certified Practitioner (SSCP) • Certified Wireless Security Professional (CWSP) • CIW Security Analyst • Wireless • Certified Wireless Network Administrator (CWNA) • Certified Wireless Analysis Professional (CWAP)