200 likes | 395 Views
1 Introduce of Anti-Piracy Solution. +. +. First Dimension : No approach. Second Dimension : No aboard. Third Dimension : No contact. Long & short distance Defense (1 st defense) To prevent of approaching and obstruct with 2 nd defense method when piracy trying to attack.
E N D
1 Introduce of Anti-Piracy Solution + + First Dimension : No approach Second Dimension : No aboard Third Dimension : No contact Long & short distance Defense (1st defense) To prevent of approaching and obstruct with 2nd defense method when piracy trying to attack 2nd Defense to prevent of aboard It also operates during 1st defense Impregnable Passive Defense Proving safe citadel during 3~5days
2 Sequential Evacuation Scenario Considering the approaching speed of piracy, Evacuation should be done within 5~7min.
2 Sequential Evacuation Scenario A. Stage I : Searching • Searching for piracy • - Radar system(BNWAS, SSAS, LRIT) • Call for help(Coast guard / Navy) • Announcement of caution(LQ and work area) BNWAS : Bridge Navigational Watch & Alarm System SSAS : Ship Security Alert System LRIT : Long Range Identification and Tracking Automatic Detection of UFO
2 Sequential Evacuation Scenario B. Stage II : Defense Automatic Detection of UFO • Active Defense 1 • : LRAD(Long Range Acoustic Device), Water Cannon, Laser, • Steam Rail, Water Jet Spray • Sweep the pirate and delay of approaching time • Control at W/H & wing with CCTV
2 Sequential Evacuation Scenario C. Stage III : Blockade • Fasten of Accommodation, E/R, S/G room doors & hatches • - Entrance / Control / other important room(including store) • - To prevent hijacking and protect of LQ • Blockade staff • - Steering Gear Room : 1P • - Engine room locking : 2P • - Accommodation locking : 1st evacuation crew
2 Sequential Evacuation Scenario D. Stage IV : 1st Evacuation • COT, LNGC & Container vessel without Dummy container • Fasten of LQ entrance door fasten of LQ inside E/R Door Evacuate to the Citadel • Fasten of Citadel door Check of emergency equipment Communication with W/H & outside • Single island container vessel with Dummy container • (As a citadel) • Fasten of LQ entrance door & E/R Door Evacuate through passage way(Dummy container) • Fasten of Citadel door Check of emergency equipment Communication with W/H & outside E. Stage V : 2nd Evacuation (Citadel or container) • Evacuation of remain crew and fasten of Citadel • Check the Piracy through CCTV and communicate with outside • (Coast guard or Navy)
3 Anti-Piracy System ※Location of Citadel each ship type • Twin Island Container Vessel • (Large ~ Ultra Large Size) Protection Area Citadel • Single Island Container Vessel (Small ~ Medium Size) and COT, LNG, etc Protection Area Citadel Or Citadel(container)
3 Anti-Piracy System Secondary Area • Crude Oil Tanker / Shuttle Tanker Citadel • LNG Carrier Secondary Area Citadel
3 Anti-Piracy System 1. General Introduction • The System is including Early detection system, Fast warning & Rescue signal • release and active defense system as well as Anti-pirate construction with • Closed deckhouse and No sunken deck. MF/HF or VHF and Inmarsat-C Fast warning & rescue signal Early Detection High performance radar Motion detection CCTV PA system Fast internal warning Active defense LRAD, Water cannon, Laser RADAR Enhanced Accommodation Enclosed deckhouse, door locking Hull structure No Sunken Deck
3 Anti-Piracy System 2. Early detection and pre-warning system 1) Early detection : Early detection of suspected targets to be the first line of defense 1-1) High performance RADAR scanner : To detect small and fast multi-targets in long range Under developing 1-2) Multi-Tracking and motion detection CCTV : To analyze the suspected targets and to transfer real time image to shore
1 Anti-Piracy System 2) Internal warning and external rescue signal release : Most effective way to avoid pirate attacks 2-1) Internal warning : Through PA system PA speaker MF/HF/ VHF/Sat-C 2-2) External rescue signal release : Through GMDSS(MF/HF, VHF DSC or Sat-C) system
3 Anti-Piracy System 3. Active defense system 1) LRAD (Long Range Acoustic Device) : To deter and delay by high decibel and automatic targeting and remote control 2) Water cannon : To deter and delay by high water pressure and remote control 3) Laser : To deter and delay by a high-powered laser beam designed to disorient and temporarily blind
3 Anti-Piracy System 4) Steam Rail: To deter and delay by spreading of hot steam via spray nozzle to Prevent aboard of piracy Piracy 5) Water jet Spray : To deter and delay by making hull surface smooth and vision interception to make embarkation of pirate difficult
3 Anti-Piracy System ※Water Cannon General Lay-out Abt. 60M Fire Main or Fire Hydrant • LOA 250m ~ 270m Crude Oil Tanker : 9eaof water cannon • Aft mooring deck : dedicated water cannon 1ea
3 Anti-Piracy System ※ Steam Rail General Lay-out F.W Tank F.W Tank Steam Boiler or Economizer in Engine room Steam spray area • Spray steam at embarkation area/ 2 area simultaneously • - expectation temp : min 140℃ (6bar) • Segregate spraying area considering steam consumption • - A-max COT : 16 block • Using of steam generate from Engine room boiler / Economizer • - Considering the open circuit : check the Boiler, Economizer performance • Control : Control panel connected with valve remote control system at W/H
3 Anti-Piracy System 4. Stronghold Deckhouse • Anti-pirate construction and facilities for deckhouse and ER spaceshall be • designed/constructed to protect or delay for deckhouse and ER space trespass by • non-authorized persons or armed pirates. Anti-grappling facility Facilities : - Enclosed traffic way in deckhouse - Anti-grappling arrangement on deckhouse outside platform. - Steel structured lobby and steel doors with lockable crossbar at entrance - Steel cover on easy accessible windows and safety film on all windows. Window safety film Window steel cover Steel door with crossbar Enclosed traffic
3 Anti-Piracy System 5. Refuge Space(citadel) • The hidden refuge space (citadel) shall be provided for refuge of crew members • during the pirates trespass in vessel. In the refuge space shall be fitted with • storage of rations and first aid kits. Facilities : 1) Protection facilities - Sound insulation for inside sound reduction - Steel Door with Additional locking (Bar Type) - Double steel door with lobby. 2) Crew facilities - One(1) public toilet - Shelf for first aid kits, rations, water and etc such as crew survival - Portable fire extinguisher - VHF telephone, I-sat telephone - GPS, SSAS push button - Emergency lighting, UPS - Overriding ER emergency stop & quick closing valves