1 / 18

DAPC Program Update Seminar December 7, 2010

DAPC Rules Update. DAPC Program Update Seminar December 7, 2010. Today's Topics. The Rule Process – an Overview Using the Guidance Documents 2010 – Year in Review In the Hopper SIP Conduit. The Rule Process – an Overview. Ohio Revised Code = Laws/Statutes

leon
Download Presentation

DAPC Program Update Seminar December 7, 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DAPC Rules Update DAPC Program Update Seminar December 7, 2010

  2. Today's Topics • The Rule Process – an Overview • Using the Guidance Documents • 2010 – Year in Review • In the Hopper • SIP Conduit

  3. The Rule Process – an Overview • Ohio Revised Code = Laws/Statutes • Ohio Administrative Code = Rules/Regulations DAPC Makes Rules! 469 Rules in Chapter 3745 of the Administrative Code

  4. The Rule Process – an Overview • Two Paths – 5 year review and Non-5yr • 5 Year Review • What is it? – ORC 119.032 • Determine if rule is.... • Necessary: Changes or No Change • Unnecessary: Rescission • Must review whole rule. • Make content changes, but also; • Fix Typos, Admin Data, IBR’s, etc... • Non-5yr: typically just a content change

  5. The Rule Process – an Overview • Typical Rule Schedule (180 – 255 Days) • Content Development – Prior to rule path • Draft Rule (IP) Comment Period • Proposal Period • Public Hearing • JCARR jurisdiction - 65 days Regular, 90 Days No-change • JCARR = Joint Committee on Agency Rule Review • JCARR jurisdiction includes JCARR hearing • No public hearing for no-change rules

  6. The Rule Process – an Overview • Typical Rule Path – continued • Final File Package • Package Review and Sign-off (15-30 days) • Final file (can be done first day after JCARR jurisdiction is over) • First possible effective date is 10 days after final filing • Revising (if necessary) • If change necessary within the first 35 days of JCARR jurisdiction • Does not lengthen timeframe • Refiling (if necessary) • If change necessary after the first 35 days of JCARR jurisdiction • Could lengthen timeframe considerably (30 day JCARR extension) • Also Emergency and No-Change

  7. Using the Guidance Documents • DAPC has developed many guidance documents • “Rule Generating and Processing Guidance” • “Rule Drafting and Formatting Guidance” • Rule package document templates • Additional outside guidance available • LSC Rule Drafting Manual • RAS/ERF Training Manuals

  8. Using the Guidance Documents • Where can I get this guidance? • J:\SHARED\rules\Rule Guidance • RAS/ ERF Library (aka the top of my file cabinet) • http://www.lsc.state.oh.us/rules/index.html • Contact me...paul.braun@epa.state.oh.us

  9. 2010– Year in Review • New Rules • None • Notable Adoptions • OAC Rule 3745-21-25 – Plastic Composites Manufacturing RACT, Submitted to USEPA 11/10/10 • OAC Rules 3745-14-(01, 06) – Facilitated Transition of Facilities from NOx SIP Call to CAIR • OAC Rule 3745-31-03 – Mid-size printing PBR and Emergency Generators • Rescinded Rules • OAC Chapter 3745-108 – Clean Air Mercury Rules (CAMR)

  10. Rule Actions – 5 yr Reviews2005 - 2010

  11. Rule Actions – New Rules2005 - 2010

  12. Total Rule Actions2005 - 2010

  13. Coming Up in 2011 • 5 Year review: The “Busy Season” continues....... • 215 Rules Started in 2010 (Most not Done Yet) • 121 Rules to Start in 2011 • New Rules • CTG RACT – Phase 3 (New CTG rules for Automotive Industry, Industrial Adhesives, Boat Manufacturing, Misc Metal/Plastic Parts)

  14. In the Hopper – What are we working on as of 12/7/10 • GHG Tailoring Rule – Draft Comment Period Ended 8/24 • Total Reduced Sulfur (3745-73): Mostly Minor Changes for 5-yr Review, Public Hearing on 12/20/10 • Sulfur Dioxide Regulations(3745-18): Removing Shut-down Facilities as Part of 5 yr review, Public Hearing 1/7/11 • About a Dozen other packages for 5-year review, Mostly minor changes

  15. More on-going items • Cleveland VOC RACT (Ch 21): “Phase 3” package to be sent to IP draft mid December, 2009 • Title V 5 yr Review (Ch 77): Proposed as of 11/24/09, Public hearing on 12/30/09 • 3745-31 PM 2.5 Updates: Changes still being made to draft. Proposal in 2010.

  16. SIP Approvals in 2010 • AAQS Reorganization (Ch 25): Approved 10/26/10, 75 FR 65572 – Consolidation of AAQS from various chapters • Particulate Matter Standards (Ch 17): Approved 10/26/10, 75 FR 65569 – Incorporates 5-yr review changes, does not include Martin Marietta in rule 3745-11 • 3745-31 NSR Reform: Originally submitted in Oct. 2004, approved 2/25/10, 75 FR 8496 • VOC RACT – Various (Ch 21): Originally Submitted is Stages Back to 2000, approved 7/21/10, 75 FR 34939

  17. What’s Going on with Rule 3745-21-07 • Effective 2/18/08 • Submitted to USEPA 4/7/08 • Additional Information Submitted on 4/27/10 and 10/25/10: 110(l) Demonstration • OAC Rule 3745-21-25: Amendments Submitted to SIP on 11/10/10 • The Plan: USEPA will rulemake on OAC rule 3745-21-25. Once that is finished, they will consider rule 3745-21-07.

  18. Thank you!

More Related