1 / 19

The New Initiatives Office - a partnership between Gemini, NOAO and our Communities

AURA’s road map to future 30m - 100m groundbased observatories - entering the “ era of the Giants ” in partnership. The New Initiatives Office - a partnership between Gemini, NOAO and our Communities. DRAFT – first thoughts (12/18/00) abbreviated version.

Download Presentation

The New Initiatives Office - a partnership between Gemini, NOAO and our Communities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AURA’s road map to future 30m - 100m groundbased observatories- entering the “era of the Giants” in partnership The New Initiatives Office - a partnership between Gemini, NOAO and our Communities DRAFT – first thoughts (12/18/00) abbreviated version

  2. AURA’s “New Initiative Office”- a New Initiative for Groundbased Astronomy • Global context • Science Drivers (highly abbreviated in this version) • Organizing for success in partnership • Focusing on Innovation

  3. Global context 2000 2010 Keck I&II Keck-Inter. ESO-VLTI NGST ALMA SIM VLA-upgrade UT1,UT2,UT3,UT4 Gemini N&S HET LBT LSST? CELT and maybe GSMT… OWL Phase A: of what? NIO timeline 2008 2000 2010 2015 The decade of adaptive optics The era of the “giants”

  4. How we will be competitive from the ground • The “Next Generation” Space Telescope (NGST) will probably launch 2006 - 2010 • an 6m - 8m telescope in space • NGST will be extremely competitive for: • deep infrared imaging, • spectroscopy at wavelengths longer than 3 microns • Groundbased telescopes can still compete in the optical and near-infrared • moderate to high resolution spectroscopy • Groundbased facilities can also exploit large baselines • high angular resolution observations

  5. “Deconstructing High z Galaxies” Integral field observations of a z = 1.355 irregular HDF galaxy (Ellis et al) “Starformation histories of physically distinct components apparently vary - dynamical data is essential” -- this is very hard on 8m – 10m telescopes

  6. Log10 Fu (mJansky) x 30 Gemini 10 s, t = 10,000s R = 1800 l (mm) Going beyond Gemini Solar System @ 10 pc Jupiter 500 mas Gilmozzi et al (1998) Models for 1 MJ Planets at 10 pc from Burrows et al 1997

  7. Observations at z = 2 - 5 1 - 10 milli- arcseconds Velocity dispersion R= 105 104 103 102 101 Imaging Spectroscopy  10 AU Galactic observations out to 1kpc at 10 mas resolution Going beyond 0.1 arcsecond astronomy requires resolution and sensitivity Flux 1 AU 1 R 100 AU 10 pc 100 pc 0.1 pc Accretion Disks Molecular Cloud Cores Mol. Outflows GMC Protoplanetary Disks AGN Jets/HH Planets Stellar Clusters

  8. New Frontiers: Galaxies Dense sampling over large fields of view: Depth: to reach z=0.5-10 for dense sampling Capabilities Large aperture Telescope Large FOV (>20’) O/IR MOS at R~5000

  9. Why a wide field Sensitivity + FOV* Large Scale Structure 100Mpc (5Ox5O), 27AB mag (L* z=9), dense sampling NBT 1.5 yr Gemini 50 yr NGST 140 yr *uniqueness cf. ESO 100m OWL

  10. The NIO – organizing for success in partnership AURA External resources Steering Committee: Pres. AURA Dir. Gemini Dir. NOAO Another (S.Strom) NIO Advisory Committee Resources Resources Gemini NIO Office PM: J. Oschmann PS: (TBD) NIO staff (allocated FTE’s) NOAO Working Groups Study Contracts

  11. Baseline Approach - ambitious at the outset • Diffraction limited telescope D ~ 30m - 100m • Operating wavelengths • Corrected Field of View • Uncorrected FOV 10 - 20 arcmins Tech. challenge 0.9mm - 3.8mm Science challenge Science challenge 1 arcmin - 3 arcmin Tech. challenge Tech. challenge • Minimize risk -- if at all possible • Focus on technologies that have the potential to produce the most innovative results • Multi-conjugate AO • Smart structures • Optical materials and support approaches • Analytical analysis of wind-buffeting • “Cheap” enclosures

  12. New Initiative’s Office, a partnership between Gemini, NOAO and our Communities • Issues • Corrected vs. uncorrected FOV • Error Budget, Complexity • Strehl ratio vs. FOV vs. No. lasers • Cost of aspheric vs. spherical M1 • Wind buffeting analysis, the role of smart structures • Mauna Kea vs. Chajnantor • Narrow vs. Wide field, detectors • National vs. International support • Working Groups • Science • Systems • Adaptive Optics • Optics • Structures and Controls • Sites • Instrumentation • Management

  13. Mirror-to-cell actuators Integrated mirror/cell segment Large stroke actuators Mirror support truss with smart structure elements/active damping as needed Possible Concept • A “radio telescope” married to active and adaptive optics Three levels of figure control: • Each mirror segment • is controlled within an individual cell • Each cell is then controlled with respect to the primary mirror support structure • The support structure may have to use “smart structure” technology to maintain sufficient shape and/or damping for slewing/tracking

  14. A proposed approach to achieving the image quality science goals LGSs provide full S.C. Deformable M2 : First stage MCAO, wide field seeing improvement and M1 shape control • Wide and narrow field science multiplexing • M2: rather slow, large stroke DM to compensate ground layer and telescope figure, or to use as single DM at >3 m. (~20000 act) • Dedicated, small field (1-2’) MCAO system (~4-6DMs). Active primary (0.1Hz)? 10-20’ Field at 0.2-0.3” seeing 1-2’ field fed to the MCAO module Focal plane

  15. How do we cost a 30 - 100m?Risk assessment examples 1 of 3 • Adaptive Optics • multiple-conjugate AO needs to be demonstrated • requires a laser solution • deformable mirror technology needs to expanded for 50m ( x 10 - 20 more actuators • How do we make “light-weight”, 2 - 4m aspheric segment mounted in its own active cell and can we afford hundreds of them? • How much dynamic range do we need to control cell-segment to cell-segment alignment ? • Will “smart”, and/or active damping systems have to be used telescope • evaluate by analysis and test. • Composites or Steel?

  16. 75m 75m 150m 150m An Enclosure for 50m -- “how big?” Risk assessment examples 2 of 3 • Restrict observing range to airmasses < 2.0 30 degrees • “Astro-dome” approach • Heretical proposition #1 - excavate • significantly lowers enclosure cost • further shields telescope from wind • reliant on AO to correct boundary layer • Heretical proposition #2 - perhaps the wind characteristics of a site are now more important than the seeing characteristics

  17. Risk assessment examples 3 of 3 • Telescope Structure and wind loading • We need to characterize this loading in a way that is relatively easy to use in finite element analysis. This is easy, but mathematically intensive. Basically for each node that gets a wind force, a full vector of force cross spectra is generated, therefore the force matrix is a full matrix with an order equal to the number of forces (10’s of thousands). • Enclosure concept (do we need one)? • What concept can we afford both in terms of dollars/euros and environmental impact (note Heretical Proposition #2) • PROBABLE CONCLUSION: WE NEED A TECHNOLOGY TEST-BED • a 20m - 30m “new technology telescope” • this is probably to only way to establish a credible cost for a 50m - 100m diffraction limited optical/IR groundbased telescope

  18. New Initiative’s Office, a partnership between Gemini, NOAO and our Communities • Working Groups • Science • Systems • Adaptive Optics • Optics • Structures and Controls • Sites • Instrumentation • Management Preliminary reports in draft form, community meetings and first design studies underway - Strategy Document by June 2001

More Related