300 likes | 490 Views
March 10,2010 Preproposal Presentation. Testing & Inspection Services - REF. Agenda. Introduction Related Projects Project Schedule Site and Building Construction Documents Proposal. QA/QC Philosophy Section 01456 Contractor—Quality Control Program Testing Inspection
E N D
March 10,2010 Preproposal Presentation Testing & Inspection Services - REF
Agenda Introduction Related Projects Project Schedule Site and Building Construction Documents Proposal
QA/QC Philosophy • Section 01456 • Contractor—Quality Control Program • Testing • Inspection • Owner—Quality Assurance Program • Testing 24 hours • Inspection 48 hours • Contractor is still responsible
Contract 28: Renewable Energy FacilityWhat’s it all about? • Contract 28 builds a 50,600 square foot multi-story building at the Southerly Wastewater Treatment Center to house the following new systems: • Biosolids dewatering and conveyance • Fluidized bed incineration • Steam production using waste heat from incineration • Electricity production using steam • This will allow Southerly to abandon its existing thermal conditioning, dewatering and conveyance, and multiple hearth incineration systems.
Contract 28: Renewable Energy Facility Incineration Truck Loading Dewatering Turbine Generator Bldg.
NORTH NORTH SOUTHERLY WASTEWATER TREATMENT CENTER MAINT. BLDG. CONSTRUCTION STAGING AREA 3 ABANDONED IMHOFF TAKS SOLIDS HANDLING & INCINERATION DIGESTER “A” TANK GROUP SITE OF RENEWABLE ENERGY FACILITY SLUDGE STORAGE TANKS TCSTs ROAB “B” DELIVERIES THRU ROAD “B” GATE CONSTRUCTION STAGING AREA 2
Scope of Work TCIS-28 (Full Time) • Project Resident Chief Inspector – fulltime; supported by coordinating Special Inspector (PE) (As Needed Basis) • Specialty Testing Services – Section 01416 • Construction Inspection Services – all disciplines • Shop Witness Testing/Inspection • Laboratory Testing Services – Section 01451
Related ProjectContract 28B: Fluidized Bed Incinerator Equipment Procurement Infilco Degremont is supplying equipment for three fluidized bed incinerator trains to be installed under Contract 28 Price: $49,753,000
Contract 28B Integration Issues: • Equipment delivered by IDI will be received by the Contract 28 contractor. • Most of the equipment IDI is supplying will be installed by the Contract 28 contractor. • IDI’s installation responsibilities are limited to: • Construction of fluidized bed incinerator shells and refractory lining of shells’ interiors • Code welding of waste heat boilers • An IDI representative will be on site to provide technical assistance for the installation of IDI-supplied equipment by the Contract 28 contractor. • For IDI-supplied equipment, site visits by manufacturers’ representatives are covered under IDI’s contract. • Contract 28 contractor will assist IDI in start-up and testing of the incinerator trains.
Project Schedule • Start: June, 2010 • 28B Delivery: Oct, 2010-Oct, 2011 • Start Commissioning: Late 2012 • Complete Work: 2013
Site Plan TRUCK LOAD-OUT BIOSOLIDS HANDLING & CONVEYANCE OFFICES TURBINE GENERATOR INCINERATION BIOSWALE (1 OF 3) GRAY WATER CISTERN Building Area = 50,600 SF; Pavement Area = 29,800 SF
Building Level SchematicBasement (El. 590.5) TRUCK LOAD-OUT MECHANICAL SPACES BIOSOLIDS HANDLING & CONVEYANCE (POLYMER SYSTEM) TURBINE GENERATOR INCINERATION
Building Level SchematicGround Floor (El. 605.5) TRUCK LOAD-OUT SUBSTATIONS CONTROL RM. LAB MULTI-PURPOSE RM. BIOSOLIDS HANDLING & CONVEYANCE NOTE: IF CROSSED OUT, THERE IS NO FLOOR AT THE LEVEL DEPICTED TURBINE GENERATOR INCINERATION
Building Level SchematicSecond Floor (El. 615.5 and 620.5) TRUCK LOAD-OUT MCCs OFFICES BIOSOLIDS HANDLING & CONVEYANCE (STORAGE BINS, CAKE PUMPS) EL. 620.5 EL. 620.5 EL. 615.5 TURBINE GENERATOR INCINERATION
Building Level SchematicThird Floor (El. 635.5) TRUCK LOAD-OUT ROOF EL. 630.50 UNASSIGNED COMM. RM. & LOCKER RMS. BIOSOLIDS HANDLING & CONVEYANCE (CENTRIFUGES) TURBINE GENERATOR INCINERATION
Building Level SchematicRoof (El. 650.5) TRUCK LOAD-OUT ROOF EL. 630.50 ROOF EXTENSION TO ACCOMMODATE OVERHEAD CRANE ON THIRD FLOOR) ROOF EXTENSION TO ACCOMMODATE WASTE HEAT BOILERS
General Building Information: • 1,057 14x73 75-ton H-piles under Biosolids Handling & Conveyance, Incineration and Offices • 17 14x73 75-ton H-piles under Truck Loading • 77 14x73 90-ton H-piles under turbine generator • 50 10x42 H-piles under biofilter • Nominal 18” thick basement floor slab; thicker at pile layouts and pile caps • Nominal 16” thick concrete perimeter walls from basement floor slab to El. 601.83 • 31’ x 10’ x 4’ thick isolated concrete pad for turbine generator
General Building Information (Cont.): • Floor grating (excluding platforms) is limited to portion of third floor in Incineration area. Remaining floors are concrete. • One freight elevator; adjacent stairwell extends from basement to roof. • One passenger elevator; adjacent stairwell extends from basement to third floor. • Modified built-up roof system. Metal roof panel system for roof extensions. • Aluminum curtain wall for Office area. • Face brick on masonry block backup for remainder of building.
Contract 28 Bid Documents 3 Drawing Volumes Containing a Total of 903 Sheets Volume 1 of 3: Title (T) 6 sheets General (G) 3 sheets Demolition (D) 21 sheets Site Civil (C) 32 sheets Process Mechanical (M) 110 sheets Architectural (A) 81 sheets Volume 2 of 3: Title (T) 6 sheets Structural (S) 109 sheets HVAC (H) 45 sheets Plumbing (P) 35 sheets Fire Protection (F) 7 sheets Instrumentation (I) 121 sheets Volume 3 of 3: Title (T) 6 sheets Electrical (E) 321 sheets
Contract 28 Bid Documents 3 Technical Specification Volumes Containing a Total of 269 Individual Specification Sections Volume 1 of 3: Div. 1 – General Requirements (49 Sections) Div. 2 – Site Construction (15 Sections) Div. 3 – Concrete (7 Sections) Div. 4 – Masonry (5 Sections) Volume 2 of 3: Div. 5 – Metals (14 Sections) Div. 6 – Wood and Plastics (2 Sections) Div. 7 – Thermal and Moisture Prot. (17 Sections) Div. 8 – Doors and Windows (7 Sections) Div. 9 – Finishes (8 Sections) Div. 10 – Specialities (10 Sections) Div. 11 – Equipment (27 Sections) Div. 12 – Furnishings (3 Sections) Div. 13 – Special Construction (23 Sections)
Contract 28 Bid Documents 3 Technical Specification Volumes Containing a Total of 269 Individual Specification Sections Volume 3 of 3: Div. 14 – Conveying Systems (5 Sections) Div. 15 – Mechanical (43 Sections) Div. 16 – Electrical (34 Sections)
Pre-Proposal Communication Information and Data requests • tcis-28@neorsd.org • (March 16th is the last day)
Proposal Content • Executive Summary (5 pages) • Qualifications (20 pages) • Individuals • Project Team • Technical Approach (30 pages) • Local Participation ~ 80% (3 pages) • SBE Participation ~ 15% (2 pages) • Testing Services Rate Schedule • Proposed Overhead Rates: field, office
Evaluation Criteria • Written Qualifications ~ 60% • Written Technical Approach ~ 25% • Presentation & Interview ~ 15% (Optional)
Requirements 15% SBE Goals • Certified List Updated Monthly • Tiffany Jordan, Contract Compliance Manager 80% Local Requirement Presentation by up to Three (3) Top Ranked Firms (Optional) • 90 minutes for presentation including 30 minutes for questions • Selection committee members will not be announced
THANK YOU FOR ATTENDING! Questions?