1 / 49

GTK gas cooling system

GTK gas cooling system. Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting 13-12-2011. OUTLINE. DESIGN CONCEPT AND OPTIMIZATION TEST SETUP RESULTS SYSTEM ASSEMBLY PROCEDURE CONCLUSIONS. OUTLINE.

leora
Download Presentation

GTK gas cooling system

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GTK gas coolingsystem Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting 13-12-2011

  2. OUTLINE DESIGN CONCEPT AND OPTIMIZATION TEST SETUP RESULTS SYSTEM ASSEMBLY PROCEDURE CONCLUSIONS Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  3. OUTLINE DESIGN CONCEPT AND OPTIMIZATION TEST SETUP RESULTS SYSTEM ASSEMBLY PROCEDURE CONCLUSIONS Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  4. DESIGN REQUIREMENT CYLIDRICAL WALL 40 mm Cooling system Supporting plate FLAT WALL 10 mm Heat flux • SHARING THE JOBS : • CYLINDRICAL WALLS SUPPORTING THE PRESSURE • FLAT WALLS DEFINING THE FLOW CROSS SECTION • MATERIAL BUDGET X0 = 0.035 % HEAT FLUX UNIFORM: HF = 2 W/cm2 TEMPERATURE GRADIENT > 30° C • THE DESIGN OF THE DETECTOR REQUIRES TO MINIMIZE THE MATERIAL BUDGET • THE COOLING SYSTEM CONCEPT DESIGN FOLLOWS THE SAME REQUIREMENT Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  5. MAKING THE PARTS ALL PARTS MADE BY FERRARA WORKSHOP Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  6. MECHANICAL TESTS KAPTON CREEP • working pressure Wp = 1 bar • Test pressure Tp = 2Wp = 2 bar • AFTER TWO WEEKS @ Tp NO EVIDENCE OF CREEP • KAPTON FAILURE PRESSURE • safety factor (40 mm) 2.0 @ Wp • QUALITY OF THE JOINT KAPTON-RESIN-ALUMINUM • safety factor 1.9 Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  7. OPTIMIZATION injection channels : share the flow rate & avoid the temperature drop on the inner edge of the detector lateral channels : the flow is injected cooled until the exit Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  8. OUTLINE DESIGN CONCEPT AND OPTIMIZATION TEST SETUP RESULTS SYSTEM ASSEMBLY PROCEDURE CONCLUSIONS Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  9. ROOM TEMPERATURE MEASUREMENT SILICON WINDOW DETECTOR MOCK UP & DISTRIBUTING CHANNELS THERMO-CAMERA Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  10. THERMAL MODEL VALIDATION THERMAL MODEL THERMOCAMERA IMAGE Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  11. TEST BENCH AND READOUT FLOW VACUUM TEMPERATURES VS TIME VACUUM POWER & TEMPERATURES FLOW RATE Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  12. TEMPERATURE SENSORS T9 T6 T7 T8 T5 FLOW T10 T11 T12 T13 T14 T1 T4 T3 T2 T0 Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  13. OUTLINE DESIGN CONCEPT AND OPTIMIZATION TEST SETUP RESULTS SYSTEM ASSEMBLY PROCEDURE CONCLUSIONS Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  14. RESULTS - 1 • 32 W – 48 W – 56 W results Pdigital/Psensor = 3.7 • 48 W: different sensor temperatures regulating the flow (4 l/min) Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  15. RESULTS- 2 measured temperatures of the sensor area (T10-T14) ΔT < 6° C average temperature regulated by flow (+5° C ÷ -30° C ) Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  16. RESULTS - 3 measured temperatures of digital area (T0-T4 and T5-T9) and sensor area (T10-T14) • set sensor and digital temperature @ nominal power <-> flow regulation • reduce max temperature and gradient Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  17. TYPICAL MEASUREMENT - 1 sensor temperature regulation by flow at different powers Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  18. TYPICAL MEASUREMENT - 2 4 W -> 56 W Pdig/Psens=3.7 32 WPdig/Psens=3.7 the system is optimized for the asymmetric power distribution Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  19. HEATERS & MATERIAL • effect on temperature distribution • local power distribution • material thermal properties digital resistance measured values [Ω] before and after the test of mockup #11 avg = 55.3 Ω std = 6.3 Ω Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  20. EXTRAPOLATION resistor spread increases longitudinal and trasversal gradient given a flow and power Ti = T x Ri / 60 Ri measured; 60 Ω nominal R; correction (extrapolation) up to 20° C Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  21. OUTLINE DESIGN CONCEPT AND OPTIMIZATION TEST SETUP RESULTS SYSTEM ASSEMBLY PROCEDURE CONCLUSIONS Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  22. THE SYSTEM • COOLING: • GAS FROM LIQUID • THE SYSTEM • how it works and costs • RUN AND MAINTENANCE • PROCEDURES • pumpdown, cooldown, time constants : fast ramp up/down, emergency warm up, 1 heater broken • INTERLOCK Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  23. GAS FROM LIQUID • the gas above a liquidbathisforcedinto the coolingpipes and cooled down by a cold head • the pressureof the dewariskeptconstant; a heater at the cold head alsoprevents low pressures • the flow isregulatedby the valve • additionalrelief valve • Pro • liquid is a reserve of gas • fast restart time after an emergency stop • cooling power: 170 W @ 77K • safe shut off: the emergency valve reduces the dewar pressure • Cons • needs cryogenic liquid • pumping vapor • COST • 4 systems: 370 k€ Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  24. THE SYSTEM • gas from liquid solution is proposed • three stations: one coling station is not cheaper since the cost of the cryogenic lines. Three pumping/cooling systems are required • each station is independent (no crosstalks) • Installation side: Jura or Saleve • 20 m of cryogenic lines: • the cooling station few meters far from the beampipe • the outer diameter is about 35 mm, we asked for a 100x100 mm2 cross section in the trench • the control system (PLC) is outside the cavern Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  25. RUN AND MAINTENANCE RUN refill liquid nitrogen start the coldhead emergency stop -> some nitrogen gas lost; the liquid is a reserve. NO access required 6 months running SAFETY cryostat: pressurized vessel cold nitrogen standard issues to be discussed with lab safety staff MAINTENANCEevery 9000 hrs (12 months run) coldhead maintenance (2 skilled persons for 2 days): head o-ring kit and compressor filters valvescheck (emergency test) Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  26. PROCEDURES pumpdown cooldown turning on and regulation warmup one chip failure emergency Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  27. PUMPDOWN • turbopump nominal pumping speed: 70 l/s (N2) • typical working pressure < 1 E-5 mbar • Improve vacuum performance: faster pumpdown and lower ultimate pressure • accurate handling/cleaning • UHV materials • vacuum before installing Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  28. COOLDOWN 29-11-2011 COOLDOWN TEMPERATURES AND FLOW stable cooldown conditions set temperature and cooling speed by flow regulation i.e. regualting the valve Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  29. TURN ON AND REGULATION + 8 W (16 –> 24 W) ΔT 25 °C in 35 s the full digital power on (48 W) requires control (heater) regulating the flow 10 seconds compatible with a few seconds full on/off valve Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  30. TURN ON PROCEDURE a heater resistor is required (on the N2 line) use of an additional temperature sensor (a TC not on the sensor) increase the flow regulating the board temperature by the heater -> nominal flow (sensor temperature > -20 Celsius) turn on the sensors and turn off the heater regulate the SENSOR temperature by the valve (flow) Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  31. WARM UPAND CHIP FAILURE • self warm up – cooling turned off • max warming speed about 40 K/h • external heating not required • temperature drop in case the heater (chip) fails is about 10 Degrees @ power 32 W • the system reads one temperature, may change the flow and/or set an allarm Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  32. EMERGENCY May 2011 • about 25 seconds with the valve closed: temperature rise 4 K/s • @25 seconds power is stopped • no need of very fast interlock: about 1 second Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  33. INTERLOCK • INPUT (4) • sensor temperature (average or 1 point) • TC on the board (requested) • chip power supply current • emergency signal • CONTROL • regulating valve opening (flow) • gas heater • bypass valve (cryostat) • coldhead + coldhead heater • OUTPUT (3) • sensor temperature (crosscheck) • regulating valve opening • status (OK/alarm) • PLC (fully hardware – interlock & control) • outside the cavern • no interaction during run • RATE: about 1Hz (typical 10Hz) Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  34. PROGRAMS • COOLDOWN • stable flow (i.e. valve opening) • regulating temperature by TC on the board • STANDBY • preparation before run and after run • TC on the board useful • RUN • control loop: Si temperature <-> valve opening • WARM UP • EMERGENCY • close the regulating valve (normally closed) • open the safety valve of the dewar (1 atm in seconds) • turn off the cryohead (and heating to room temperature if possible) • emergency signal output Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  35. OUTLINE DESIGN CONCEPT AND OPTIMIZATION TEST SETUP RESULTS SYSTEM ASSEMBLY PROCEDURE CONCLUSIONS Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  36. INTEGRATION – PHASE 1 mask aligner : the supports are inserted in the reference places SLIDING SUPPORT GUIDES TEFLON MASK ALIGNER FIXED SUPPORT UNDERCUT FITTING THE PCB THICKNESS Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  37. INTEGRATION – PHASE 2 Mounting the mask aligner in the PCB supporting plate SLIDING SUPPORT GUIDES & FIXED SUPPORT REFERENCE PINS TEFLON MASK ALIGNER PCB SUPPORTING PLATE TEFLON MASK ALIGNER SEAT Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  38. INTEGRATION – PHASE 3 Glueing the sliding support guides and the fixed support on the PCB REFERENCE PINS MASK ALIGNER PCB SUPPORTING PLATE Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  39. INTEGRATION – PHASE 4 inserting the sliding support after the resin curing SLIDING SUPPORTS PCB Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  40. INTEGRATION – PHASE 5 mounting PCB & detector supports on The PCB support plate PCB DETECTOR SUPPORTS PCB SUPPORT PLATE Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  41. INTEGRATION – PHASE 6 gluing the detector on the detector supports PCB DETECTOR REFERENCE PINS DETECTOR SUPPORTS DETECTOR REFENCE UNDERCUT PCB SUPPORT PLATE Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  42. INTEGRATION – PHASE 7 The centre of the detector is referred outside the vacuum vessel OUTHER REFERENCE CENTRE OF THE DETECTOR INNER REFERENCE CENTRE OF THE DETECTOR DETECTOR CENTRE (NOMINAL) Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  43. INTEGRATION – PHASE 8 bonding the wires WIRE BONDS Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  44. INTEGRATION – PHASE 9 ASSEMBLING THE TWO HALF VESSELS Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  45. INTEGRATION – PHASE 10 MOUNTING THE TUBES Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  46. TEST OF THE PCB & DETECTOR ASSEMBLY PROCEDURE THERMAL SHOCK ROOM TEMPERATURE TO 77 K Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  47. TEAM design, simulation, tests, development & construction Manuel BOLOGNESI (electr. service) Stefano CHIOZZI (electr. service) Angelo COTTA RAMUSINO (electr. service) Luca LANDI (mech. service) Roberto MALAGUTI (electr. service) Michele MELCHIORRI (mech. service) Claudio PADOAN (electr. service) Stefano SQUERZANTI (mech. service) Ferruccio PETRUCCI Vittore CARASSITI (mech. service) Marco STATERA (vacuum & cryo service) Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  48. CONCLUSIONS -1 • design concept and optimization • mechanical design and test: safety factor >2 • material budget Xo = 0.035 % • optimization • room temperature and working condition test benches • FEM flow simulation validated • the results we have shown • the final prototype tested in working conditions: power, power distribution, temperature and vacuum • the system has been tested up to 56 W (actual power distribution) • regulation of the sensor temperature by the flow rate: 0 ÷ -20° C @ 48 W • the system can work with different power distributions: 32 W homogeneus power distribution results Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

  49. CONCLUSIONS - 2 • system overview • cooling method: gas from liquid nitrogen • installation requirements • no access required during a full run • measured parameters for different working states • control and interlock • input/output defined • running programs defined • interlock conceptual design for different working states • integration • realistic integration sequence • three points holder assembled and tested in severe thermal conditions Na62 GTK working group meeting, CERN 13-12-2011 Marco Statera

More Related