Project Monitoring and Evaluation in the GMS 7-18 May 2012, Mekong Institute, Khon Kaen. Project Monitoring and Evaluation for Road Construction in Lao PDR By Vone Phaengsuwan Department of Planning and Cooperation Ministry of Public Works and Transport (MPWT) LAO P.D.R.
E N D
Project Monitoring and Evaluation in the GMS 7-18 May 2012, Mekong Institute, Khon Kaen Project Monitoring and Evaluation for Road Construction in Lao PDR By Vone Phaengsuwan Department of Planning and Cooperation Ministry of Public Works and Transport (MPWT) LAO P.D.R
Project Monitoring and Evaluation in the GMS 7-18 May 2012, Mekong Institute, Khon Kaen • Contents: • Project Title • Background • Stakeholder Analysis • Design and Monitoring Framework (DMF) • Work Breakdown Structure (WBS) • M & E Implementation Plan
Project Monitoring and Evaluation in the GMS 7-18 May 2012, Mekong Institute, Khon Kaen Project Title: The Road Improvement of 1J (97km) on Cambodia-Laos-Vietnam (CLV) Development Triangle Background: • The project is also a main and priority road which include in a programme of Cambodia, Lao PDR and Vietnam Development Triangle, for increasing the efficiency and promoting the trade, tourism opportunity and social/economic development in this region. The region is to be designated as the Industrial Region for transportation and trade purposes and as a Eco-Tourism zone for tourism development for the North-Eastern and Eastern of Cambodia, Southern Lao PDR and Central of Vietnam. • To make a contribution to the development of Monitoring and Evaluation in the Ministry of Public Works and Transport, especially in improving road in Lao PDR.
Location Map Site Location: NR 1J
Work Breakdown Structure (WBS) 1.1 Engineering Survey 1.2 Topographic Survey 1.3 Geotechnical Investigation 1.4 Drainage Survey 2.1 Road Design 2.2 Pavement Design 2.3 Drainage Design 2.4 Bridge and culvert Design 2.5 Environmental and Social Consideration 3.1 Construction Plan 3.2 Cost Estimate (BOQ) 3.3 Tender Document 4.1 Contract signed 4.2 Construction Work
Linking DMF & Data Collection Tools in M&E implementation Plan