Outbrief for: COSYSMO Extension as a Proxy for Systems Cost Estimation

Outbrief for: COSYSMO Extension as a Proxy for Systems Cost Estimation. Reggie Cole Lockheed Martin Senior Fellow reggie.cole@lmco.com Garry Roedler Lockheed Martin Fellow garry.j.roedler@lmco.com. October 24, 2013. Overview of Cost Analysis Approach & Results. Pessimistic. Optimistic.

lesa
Download Presentation

Outbrief for: COSYSMO Extension as a Proxy for Systems Cost Estimation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Outbrief for: COSYSMO Extension as a Proxy for Systems Cost Estimation Reggie ColeLockheed Martin Senior Fellowreggie.cole@lmco.com Garry RoedlerLockheed Martin Fellowgarry.j.roedler@lmco.com October 24, 2013

  2. Overview of Cost Analysis Approach & Results Pessimistic Optimistic Expected Requirements Requirements Baseline Interfaces Algorithms Architecture Baseline Scenarios Run Monte Carlo Simulations and Generate Cumulative Distribution of Costs Bias Function Effort Conversion Factor Stochastic Adder Factors Target Cost Risky Range Target Reserve

  3. Workshop Objectives • Validation of the Approach • Review the basic approach and get a consensus on its overall validity • Improvement of the Approach • Recommendations on how the approach might be improved • Decide on Next Steps for the Community • How do we move forward with the approach?

  4. Conclusions and Recommendations (1 of 3) • Validity of overall approach • Unanimous support – approach is valid and should continue to be developed and refined for wider application • Feedback was all focused on ensuring all factors had been considered and areas for refinement – no discussion resulted in conclusion that the approach had major issues • Appropriately uses the concepts of COSYSMO and tailors the perspective for systems

  5. Conclusions and Recommendations (2 of 3) • Improvement of Approach • Best distribution to use? Cumulative, frequency, or other? • Preference is to not change the Scale Factor • Want to retain as close to COSYSMO as possible – ready to leverage COSYSMO 3 • Review and refine the bias function and calibration of the bias function • May consider adding in other COCOMO factors, as applicable • May need to establish rules for when to leverage a HW model using the same approach to use as input for HW, when highly HW intensive • May need to consider calibration for different types/classes of systems • Bottom line – User needs to consider what tailoring/adaptation of the bias function is needed for the system application • Determine under what conditions it OK to eliminate a cost factor • Additional use cases? • Should include Impact Analysis / Change Evaluation

  6. Conclusions and Recommendations (3 of 3) • Thoughts on moving forward • Form small, diverse working group • Periodic meetings (USC ARR, COCOMO Forum, INCOSE IW, …) • Validation through pilots • Use on completed programs • Access the more robust data points from COSYSMO data • Comparison of estimates • Use on non-LM programs • Incorporate feedback from validation and refine • Can this support the SERC project for COSATMO?