1 / 6

DAY Care

Topographic survey would include longitudinal profile (in stream – as blue line) and proposed perpendicular profiles – as red lines – using the robotic total station and “measured topo points”. The red boxes are locations of Continuous Topography (i.e. data points spaced <0.5m). DAY Care.

lew
Download Presentation

DAY Care

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Topographic survey would include longitudinal profile (in stream – as blue line) and proposed perpendicular profiles – as red lines – using the robotic total station and “measured topo points”. The red boxes are locations of Continuous Topography (i.e. data points spaced <0.5m). DAY Care

  2. Topographic survey would include longitudinal profile (in stream – as blue line) and proposed perpendicular profiles – as red lines – using the robotic total station and “measured topo points”. The red boxes are locations of Continuous Topography (i.e. data points spaced <0.5m).

  3. DAY Care

  4. 121 122 Topographic survey would include longitudinal profile (in stream – as blue line) and proposed perpendicular profiles – as red lines – using the robotic total station and “measured topo points”. The red boxes are locations of Continuous Topography (i.e. data points spaced <0.5m). 115 SURVEY NOTES: Control Points 110 thru 113 shown for Stream Section 2, in total station data. GPS Control Point is 115, in GPS data from July 21, 2011. Please record Total Station (wall-e) measurements at positions 121 and/or 122 with control points from Stream Section 2 (day care to Art Barn entrance) in order to tie the surveys together. 113 110 DAY Care 112 111

  5. Topographic survey would include longitudinal profile (in stream – as blue line) and proposed perpendicular profiles – as red lines – using the robotic total station and “measured topo points”. The red boxes are locations of Continuous Topography (i.e. data points spaced <0.5m). 123 120 121 SURVEY NOTES: GPS Positions shown with labels, in GPS data from July 22, 2011 Please record Total Station (wall-e) measurements at positions 121 and/or 122 with control points from Stream Section 3 (old bridge at day care to Art Barn entrance) in order to tie the surveys together. 122

More Related