1. BOEMRE UPDATE AADE Luncheon Meeting
3 March 2011
John Peters
2. After the Incident - DOI/BOE Gave a Clear and Consistent Message Improvement needed in three areas before drilling will be allowed:
Prevention of another blowout
Demonstrate increased intervention capability
Demonstrate increased oil spill response capability
Industry heard the message loud and clear
2
3. Energy Industry Response Initially Created 2 Joint Industry Task Forces
Prevention - May
Operating Procedures Task Force
Equipment Task Force 3
4. JITF (Operating Procedures & Equipment)White Paper Recommendation Cementing – API RP65 Part 2
Develop DW well design standard (now API RP 96)
Lock casing hanger in HPWH
Close BOP’s to circ out Lighter Fluids to prevent gas in riser
Monitor volumes in and out of wellbore
Position shearable components across shear rams
Recommend 2+ independent barriers for each flow path
Safety Case & WCID (now API Bul 97)
Robust MOC
ROV stabs - API Spec 17H 4
5. Increased Safety Measures 30 Day Report (aka Buffalo Report) Certification of Subsea BOP Stack
Blind Shear redundancy, ROV access, secondary controls, etc.
New Testing – Auto Shear, Deadman, etc.
New Deepwater Well Control
Circulate out lighter fluids with BOP’s closed
Lock Hanger, Negative testing, etc.
Wild-Well Intervention - Containment
Increased Enforcement of Existing Safety Regulations and Procedures
Safety Case and WCID
ETC, Etc, etc 5
6. NTL 2010-N05 One time Corporate Officer Compliance Certification (Executive Level)
One time BOP data set … etc
Ongoing 3rd Party BOP Certifications by well
Ongoing PE Certification Letter by well
ETC, Etc, etc …
6
7. NTL 2010-N06 Ongoing Worst Case Discharge submission by well
ETC, Etc, etc …
7
8. Energy Industry Response Created 2 more Joint Industry Task Forces
Intervention - July
Subsea Intervention and Containment Task Force
Spill Response - July
Oil Spill Response Task Force
8
9. Interim Final Rule Drilling Safety Ongoing API RP 65 Part 2 Compliance Questionnaire
Ongoing Should = Must in API Standards referenced in CFR(?)
There were already 97 Standards referenced in the CFR
Of these, 37 apply to D&C Operators and/or Contractors:
ANSI/ASME - 4
API - 31
AWS - 1
NACE – 1
ETC, Etc, etc …
9
10. Final Rule Work Place Safety One year to deploy
Ongoing Safety and Environmental Management System (SEMS) requirements
Modeled after API RP 75
Holds Operator accountable for all aspects of Safety and the Environment, inclusive of actions of their Contractors
ETC, Etc, etc …
10
11. Ongoing Compliance Statement by well (Drilling Manager or Other)
Ongoing Containment Plan by well
ETC, Etc, etc …
NTL 2010-N10 11
12. NTL-10 Containment Level 1 WCD Casing Spreadsheet
Level 2 WCD Casing Template (if exceeds Level 1)
Need Oil Gradient discussion justification
Need No Broaching to Mudline discussion justification
Need Detailed Casing Design analysis – WellCat for Thermal modeling, ETC, Etc, etc.
BURST – Due to Capping Stack shut-in on Oil Gradient
COLLAPSE – Deep liners, due to flowing internal Oil Gradient against Seawater at Mudline
12
13. Application for Permit to Drill (APD) Roadmap 13
14. Industry API RP 96 – Deepwater Design Considerations
Shall circulate out lighter fluids w/ BOP's closed.
Shall lock hanger in the HPWH as next reasonable step.
Shall have a Barrier Plan.
Shall have a Negative Test and Fluid Displacement Plan.
Shall use a MOC process.
Shall have a Stop Work Authority program.
ETC, Etc, etc …
Target Release ~ April / May 2011
14
15. Industry API Bulletin 97 – WCID
Section 1 – Well Construction Interface
Plan to simplify
Section 2 – Safety and Environmental Interface
Plan to align with SEMS only and remove reference to Safety Case
Target Release ~ April / May 2011
15