An Introduction to SimaPro. Why Use It?Program StructureGoal and Scope DefinitionInventory AnalysisImpact AnalysisInterpretationBuilding a LCA in SimaProNavigating SimaProWhere to find dataEntering data. Why SimaPro?. Market-leading LCA software developed by PR
E N D
1. An Introduction to Life Cycle Assessment with SimaProColin McMillan This presentation assumes that the audience is familiar with the basic concepts of LCA.This presentation assumes that the audience is familiar with the basic concepts of LCA.
2. An Introduction to SimaPro Why Use It?
Program Structure
Goal and Scope Definition
Inventory Analysis
Impact Analysis
Interpretation
Building a LCA in SimaPro
Navigating SimaPro
Where to find data
Entering data
3. Why SimaPro? Market-leading LCA software developed by PRé Consultants (Netherlands).
Provides access to a large amount of licensed (i.e. not publicly available) LCI data.
Speeds the calculation of LCI and LCIA (matrix inversion calculation routine).
SimaPro allows users to organize material and energy flows into a database of product and process building blocks.
LCAs of materials and processes are then constructed with these building blocks. Its interesting to note that SimaPro now utilizes the matrix calculation routine described by Heijungs and Suh.Its interesting to note that SimaPro now utilizes the matrix calculation routine described by Heijungs and Suh.
4. SimaPro Organization Organized based on LCA stages:
Goal and scope definition
Inventory
Impact assessment
Interpretation
5. Goal and Scope Definition Description
Multiple fields for discussion of project goal, functional unit, and other details.
Data Quality Indicators (DQIs)
Used to record data time period, geography, representativeness, allocation, system boundaries.
Allows users to evaluate the appropriateness of data and to define DQI requirements and weightings.
Your ideal LCI data are the most current possible and are obtained from the same geographic area as your study.
Complete documentation of data sources, data quality, and any associated assumptions are of KEY IMPORTANCE.
6. Life Cycle Inventory: LCA Building Blocks Processes
Describe materials, transportation, production processing, and disposal processing in terms of input & output flows of substances:
Environmental Flows- most commonly used. Include emissions to air, water, and soil, solid wastes, non-material emissions (i.e. radiation, noise), use of natural resources.
Economic Flows- include inputs from other processes, economic outputs (e.g. products), waste outputs for treatment, avoided processes, economic inputs.
Social Flows- user specified.
Product Stages
Assemblies, life cycle, disposal scenarios, reuse, disassembly used to describe the overall product and its life cycle. Avoided processes, or avoided products, refer to a choice to expand system boundaries. Impacts associated with these will be subtracted from the total impacts.
Waste Outputs for Treatment- SimaPro allows you to build a specific sort of treatment process (e.g. all of the material and energy flows associated with a tertiary WWT system) and link the amount of waste produced to this process. SimaPro will then calculate the environmental burden associated with treating the specified mass of waste. Avoided processes, or avoided products, refer to a choice to expand system boundaries. Impacts associated with these will be subtracted from the total impacts.
Waste Outputs for Treatment- SimaPro allows you to build a specific sort of treatment process (e.g. all of the material and energy flows associated with a tertiary WWT system) and link the amount of waste produced to this process. SimaPro will then calculate the environmental burden associated with treating the specified mass of waste.
7. Life Cycle Inventory: LCA Building Blocks Substances: Inputs from Nature (Resources)
These are the most basic blocks in SimaPro and express the use of natural resources.
They are materials as they exist in nature and have neither emissions nor energy consumption associated with them. Example: limestone in ground.
Inputs from Technosphere: Materials/Fuels & Electricity/Heat
These are inputs from other processes.
The building blocks that define human products and processes and contain defined inputs and outputs. Example: limestone mining, heat from an industrial furnace.
Distinction between inputs: Materials/Fuels have mass units. Electricity/Heat have units other than mass.
8. Process Types: Systems and Unit Processes A system type process includes only inputs from nature (the furthest point upstream) and emissions. A black box is created, reducing transparency.
A unit process type process identifies all of the sub processes used, each of which have inputs from nature and emissions. Individual sub processes can be modified with updated data or data from a new geographic area (i.e. in order to make European process data for mfg HDPE more suitable for use in a U.S. LCA, substitute U.S. electricity production for the given electricity process)
9. Process Types: Systems and Unit Processes
10. Product Stages: Assembling the Building Blocks Product Stages
Do not directly contain environmental, social, or economic flows; instead are used to assemble materials and processes to describe various life cycle stages.
Assemblies
The product specification of component materials, transportation, and mfg processes.
An assembly is a cradle-to-gate representation of a product.
End-of-Life Scenarios
Enables user to describe separate processes for disposal, disassembly, and reuse.
Life Cycle
Links the product specifications (assemblies) with defined use phase and end-of-life scenario.
Can be linked to other life cycles, enabling the user to model a products use of other products.
11. Example Product Assembly
12. Example Product Life Cycle
13. Relationships Among Building Blocks Its important to understand how the different building blocks in SimaPro are related. This slide is an attempt to explain the relationships. Limestone (Ca2CO3, in ground) is the basic resource (a substance) and is used as an input to Mined Limestone, a material process. Mined limestone can be used by an assembly, Fiberglass Insulation, or by another process, Electricity Generation. Electricity generation produces CO2, an emission (a substance) and can be used in an assembly or a life cycle, operation of a residential home.Its important to understand how the different building blocks in SimaPro are related. This slide is an attempt to explain the relationships. Limestone (Ca2CO3, in ground) is the basic resource (a substance) and is used as an input to Mined Limestone, a material process. Mined limestone can be used by an assembly, Fiberglass Insulation, or by another process, Electricity Generation. Electricity generation produces CO2, an emission (a substance) and can be used in an assembly or a life cycle, operation of a residential home.
14. Calculating, Analyzing, and Interpreting Results Network
Tree
Analyze
Compare
Uncertainty Analysis
15. Analyzing & Interpreting Results: Networks and Trees Both networks and trees show the relationships within and between processes and assemblies.
Unlike a tree, a network shows looped relationships between processes
Contribution Analysis- both can track contributions of substances, emissions, and impact assessment results. Figure obtained from Pre Consultants, 2006. SimaPro 7 Tutorial. The Netherlands. http://www.pre.nl. Accessed 10/20/2006. Figure obtained from Pre Consultants, 2006. SimaPro 7 Tutorial. The Netherlands. http://www.pre.nl. Accessed 10/20/2006.
16. Analyzing & Interpreting Results: Analyze & Compare Choosing either will calculate LCI and LCIA results. Compare is used to create a side-by-side comparison of multiple processes or assemblies.
Shown is the new pre-calculation screen. This allows the user to easily change the amount of product calculated and to choose a new impact assessment methodology.Shown is the new pre-calculation screen. This allows the user to easily change the amount of product calculated and to choose a new impact assessment methodology.
17. Life Cycle Inventory (LCI) Results A life cycle inventory (LCI) is the environmental balance sheet for a process or material.
It records material and energy flows entering and leaving the process or material.
Later used to calculate the life cycle impact assessment
18. LCI Results
19. Life Cycle Impact Assessment (LCIA) LCI results are aggregated and adjusted to describe their relevance in a more meaningful way. Multiple steps of calculation are involved- depend on Midpoint or Endpoint approach.
Classification
Defines the impact categories and their substances.
Characterization
Reflects the relative contribution of a LCI flow (a substance) to the impact category result.
Normalization
Defines the extent to which an impact category contributes to the total environmental burden.
Weighting
Process by which indicators are aggregated into a single score. Uses subjective weighting factors.
20. Getting to Know Your Impact Assessment Methods (v 7.0) Endpoint Methods: include emission, fate, exposure, effect, and damage. Provides more intuitive measures, but at the expense of certainty.
Eco-Indicator 99
Impact 2002
Ecopoints 97
Midpoint Methods: include emission, fate, and exposure. Less uncertainty than endpoints.
TRACI 2002: U.S. EPA. Characterization only- no normalization or weighting.
CML 2 baseline 2000
21. LCIA Example: Climate Change in EcoIndicator 99
22. LCIA Results Based on the type of impact assessment methodology chosen, it may be possible to see results from each stage of the LCIA (characterization, damage assessment, normalization, weighting, and single score.
23. Connection Between Inventory and Impact Assessment LCI emissions must be matched to the substances contained in impact assessment categories. If not, the emissions will not be captured by the impact assessment method.
The Checks Tab
Lists substances that are not being captured by the selected impact assessment method.
24. Analyzing & Interpreting Results: Uncertainty Analysis Latest version of SimaPro (v7.0)incorporates Monte Carlo analysis for calculating uncertainty in process inputs and outputs, as well as product stages, in LCI and LCIA.
HOWEVER, information on the types of distributions and other uncertainty parameters are only included with the EcoInvent database.
25. Uncertainty Analysis: Example Uncertainty data are provided in the Ecoinvent database for unit processes. Uncertainty data are provided in the Ecoinvent database for unit processes.
26. An Introduction to SimaPro Why Use It?
Program Structure
Goal and Scope Definition
Inventory Analysis
Impact Analysis
Interpretation
Building a LCA in SimaPro
Where to find data
Entering data
27. Getting to Know Your Underlying Databases (v 7.0) EcoInvent v1.2 (2005)
Swiss energy production, transport, and materials.
Industry Data (2001)
Data collected by industry associations, such as the Association of Plastics Manufacturers in Europe (APME).
Idemat (2001)
Production of various materials, compiled by Delft University (Netherlands)
Buwal 250 (1997)
Packaging materials for the Swiss Packaging Institute.
ETH-ESU (1996)
Swiss and Eastern European production of energy, resource extraction, raw material production, production of semi-manufactures, auxiliary and working materials, supply of transport and waste treatment services, and infrastructure construction.
Franklin (1996)
North American materials, energy, and transport.
28. Sources of Publicly Available LCI/LCA Data U.S. LCI Database: http://www.nrel.gov/lci
Managed by the National Renewable Energy Lab
Sources include Franklin Associates, Athena Institute,
Association of Plastics Manufacturers in Europe (APME): http://www.plasticseurope.org
LCI data contained in eco-profiles, developed by Boustead.
Peer-Reviewed Journals
Journal of Industrial Ecology, International Journal of Life Cycle Assessment, Journal of Cleaner Production, Environmental Science & Technology, and others
29. US. LCI Database
30. U.S. LCI Database Data Data arranged in spreadsheets. Were concerned with the streamlined and detailed spreadsheets.
Streamlined Spreadsheets
Contain information on scope & boundary, data quality indicators, and data sources.
LCI data should look familiar; arranged by inputs from nature, inputs from technosphere, outputs to nature (air, water, soil emissions).
Detailed Spreadsheets
Contain supporting calculations and references
31. U.S. LCI Database Data: Al Precision Sand Casting Streamlined Spreadsheet Co-Products: according to the documentation, all environmental flows of the co-products are included in the products total environmental flows. No co-product allocation occurs if the scrap materials are reused or recycled. I assume that an economic allocation would be appropriate if these co-products were sold
Please note that in order to display all of the data categories, a number of entries for inputs to technosphere and outputs to nature were hidden. Co-Products: according to the documentation, all environmental flows of the co-products are included in the products total environmental flows. No co-product allocation occurs if the scrap materials are reused or recycled. I assume that an economic allocation would be appropriate if these co-products were sold
Please note that in order to display all of the data categories, a number of entries for inputs to technosphere and outputs to nature were hidden.
32. Entering Data into SimaPro: North American Natural Gas Extraction Data from U.S. LCI Database
Data Description:
Process type: unit process
Geographical Representation: N. America
Year: 2003
Technical Representation: Offshore and onshore extraction, includes gas co-extracted with crude oil.
Data Sources: Government and industry sources.
Functional Unit: extraction of 1,000 cu ft of natural gas
33. Entering Data: Documentation
34. Entering Data Note that the inputs from other processes represent the various forms of energy required for natural gas extraction. For example, in SimaPro the Diesel equipment (gal) process contains all of the material and energy flows of combusting a specific volume of diesel in a generic equipment engine.
Since the Heat from nat. gas and Heat from RFO processes are in Btus and the LCI data are in cubic feet and gallons, respectively, conversion is necessary (as indicated in the comment fields). Conversion factors would be the heat content of each fuel, likely obtained from the U.S. DOE. Note that the inputs from other processes represent the various forms of energy required for natural gas extraction. For example, in SimaPro the Diesel equipment (gal) process contains all of the material and energy flows of combusting a specific volume of diesel in a generic equipment engine.
Since the Heat from nat. gas and Heat from RFO processes are in Btus and the LCI data are in cubic feet and gallons, respectively, conversion is necessary (as indicated in the comment fields). Conversion factors would be the heat content of each fuel, likely obtained from the U.S. DOE.
35. Wheres the Energy?Energy Accounting in SimaPro Energy Accounting Definitions
Energy accounting is a fundamental concept in LCA.
Feedstock Energy- the amount of energy contained in a material that is not used as an energy source. The heat of combustion of a material, expressed in terms of HHV or LHV.
Process (Fuel) Energy- the amount of energy contained in fuel that is combusted for work or heat.
Total Primary Energy- the total amount of fuel and feedstock energy consumed by a product or process over its entire life cycle.
Energy can be tracked in two ways in SimaPro
Input from nature specified with heat of combustion (Oil, crude, feedstock, 41 MJ/kg, in ground). This approach necessitates creating a new input for each new heat of combustion value.
Create energy reminders as Non Material Emissions:
36. Advanced Topics Describing waste disposal and EOL processes: Waste Scenarios, Disposal Scenarios, Disassembly, Reuse.
Creating Parameters
37. Waste Scenarios, Disposal Scenarios, Disassembly, and Reuse Used to build descriptions and to define impacts of EOL processes
Commonly an under utilized feature of SimaPro
Waste Scenarios are SimaPro processes and are used to describe where waste flows go. They require additional waste treatment processes to describe
Example: a waste scenario for municipal waste describes the %s of certain materials collected from waste stream. An incineration process describes the emissions resulting from incineration.
Disposal Scenarios, Disassembly, and Reuse are SimaPro product stages and are used to describe the EOL processes for the product youre modeling, as well as any of the products assemblies and subassemblies.
Example: a disposal scenario describes the transportation energy required to collect a discarded coffee maker and includes the %s of the overall coffee maker that are disposed, disassembled and recovered, and reused.
38. Waste Scenarios: Identifying Waste Flows and Where They Go A material or process must have a defined waste type in order to be included in a waste scenario. This is the waste flow.
39. Waste Scenarios: Describing the Treatment of Waste Flows After initial separation, household waste is linked to the municipal waste scenario. Here, additional separation occurs before waste is incinerated and landfilled
40. Disposal Scenarios, Disassembly, and Reuse Separate disassembly and reuse stages are used to describe specifics.
41. Relationships Among Disposal & EOL Processes Again, Im attempting to establish how the different waste scenarios and waste disposal modules are related.Again, Im attempting to establish how the different waste scenarios and waste disposal modules are related.
42. Advanced Concepts: Parameters Parameters (new in SimaPro v. 7): allow user to model relationships within inventory data through mathematical expressions.
Used for sensitivity analysis, including boundary, transportation, and, allocation choices.
Create nonlinear models.
Define and evaluate uncertainty in LCI data.
Used to develop Product Scenarios.
Example: create multiple design options for a product by defining parameters for dimensions and materials.
No longer a need to create multiple assemblies or life cycles for evaluating different product & process designs.
43. Advanced Concepts: Parameters Example Application Assume we are using SimaPro to evaluate different designs for wood shed.
44. Your Homework