An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project 2010-17 Definition of Bulk Electric System Presenter: Peter Heidrich – Drafting Team Chair Date: March 1, 2011

  2. Topics to be Covered • FERC Order No. 743 Directives • Project Goals • Project Assumptions • BES Definition Concept • Drafting Team Coordination

  3. FERC Order No. 743 Directives Revision to Rules of Procedure Exception Process (Procedure) Study Methodology (Potential Field Test) Project 2010-17 Definition of Bulk Electric System Core Definition Exception Criteria Review of Existing NERC Reliability Standards Review of Existing Regional Reliability Standards Implementation Plan Project Components Core Definition Exception Process (Procedure) Implementation Plan Transition Plans NERC & Regional Entities Transition Plans

  4. Project Goals • Revise the definition of Bulk Electric System (BES) to improve clarity, to reduce ambiguity and to establish consistency across all Regions. • Establish a ‘Bright-Line’ Definition • Ease burden of identification of BES & non-BES Elements • Definition that covers 95% of Facilities

  5. Project Assumptions • Current application of definition is generally correct. • Definition will be applied ‘continent-wide’. • The BES is contiguous. • The revised definition will not: • Significantly expand or contract what is currently considered to be BES. • Drive Entity registration or de-registration.

  6. BES Definition Concept Component-Based “Bright-Line’ Definition Core Definition Exception Criteria • Inclusion Criteria • Transformers • Generation • Transmission • TBD • Exclusion Criteria • Radials • TBD

  7. Drafting Team Coordination Revision to Rules of Procedure Exception Process (Procedure) Study Methodology (Potential Field Test) Project 2010-17 Definition of Bulk Electric System Core Definition Exception Criteria Review of Existing NERC Reliability Standards Review of Existing Regional Reliability Standards Implementation Plan NERC & Regional Entities Transition Plans

  8. Keys to Project Success • Effective Communications • Drafting Team Coordination • Concurrent Postings • Industry Participation • Meeting ‘Time Deadline’ Directives

  9. Question & Answer Website: http://www.nerc.com/filez/standards/Project2010-17_BES.html