ATF BPMs SLAC-BINP BPMs ~ 6 meters SLAC & KEK BPMs at ATF Two BPM experiments at ATF ATF BPM – Toyoko Orimoto
Introduction • During March trip… connected ATF BPMs to SLAC generation 1 electronics Signal smaller than expected • Short decay time • Lower freq oscillation on top of usual ~20MHz • Attempted calibration of KEK BPMs during March trip • On this trip… waveforms from the BPMs look much better • Another attempted calibration ATF BPM – Toyoko Orimoto
Trigger Ref SLAC x1 (for comparison) Raw Waveforms from ATF BPMs 18 March ‘05 calibration run y1 x1 ~2 MHz ~24 MHz y2 x2 y3 x3 ATF BPM – Toyoko Orimoto
Corrector Bump Calibration: Amp vs Event X 0→-875mm Dataset X1 X2 X3 Amplitude event X 0→+875mm Dataset X1 X2 X3 Amplitude ATF BPM – Toyoko Orimoto event
Waveforms BPM X1: X 0→-875mm 0 -125 -250 -375 -500 -625 -750 -875 -250mm 0mm -125mm -375mm -750mm -500mm -625mm -875mm ATF BPM – Toyoko Orimoto
Amplitude: Cross-coupling (I) X 0→-875mm Dataset Y2 Amp Y1 Amp Y3 Amp X2 Amp X1 Amp X3 Amp X 0→+875mm Dataset Y2 Amp Y1 Amp Y3 Amp ATF BPM – Toyoko Orimoto X2 Amp X1 Amp X3 Amp
Amplitude: Cross-coupling (I) Y 0→-875mm Dataset Y2 Amp Y1 Amp Y3 Amp X2 Amp X1 Amp X3 Amp Y 0→+875mm Dataset Y1 Amp Y2 Amp Y3 Amp ATF BPM – Toyoko Orimoto X2 Amp X1 Amp X3 Amp
Waveforms from May 24 May ‘05 run Ref X2 Y1 Y3 X3 Y2 ATF BPM – Toyoko Orimoto
Corrector Calibration • Bump beam in 50mm steps using corrector magnets • Used correctors upstream of SLAC-BINP BPMs • Quads off – from QD6X downstream Beam orbit vs extraction line BPM # ATF BINP ATF BPM – Toyoko Orimoto
Corrector Calibration Response in BINP BPMs is what we expected… BINP Y1 BINP Y3 BINP Y2 Amplitude event ATF BPM – Toyoko Orimoto
Corrector Calibration X -700mm →+700mm Ref X2: Broken channel X3 Amplitude event Y1 Y3 Y2 Amplitude ATF BPM – Toyoko Orimoto event
Corrector Calibration Y -700mm →+700mm Ref X2: Broken channel X3 Amplitude event Y1 Y3 Y2 Amplitude ATF BPM – Toyoko Orimoto event
Conclusions • Continue studying these BPMs • Three shifts this week • Repair X2 broken channel ? • Steer beam through ATF BPMs • Perform proper calibration • What changed between March and May data? ATF BPM – Toyoko Orimoto
Corrector Bump Calibration: Amp vs Event Y 0→-875mm Dataset Y1 Y2 Y3 Amplitude event Y 0→+875mm Dataset Y1 Y2 Y3 Amplitude ATF BPM – Toyoko Orimoto event
Calibration: Amp vs Beam Offset X 0→-875mm Dataset BPM X1 BPM X2 BPM X3 Amplitude X 0→+875mm Dataset BPM X1 BPM X2 BPM X3 Amplitude ATF BPM – Toyoko Orimoto
Calibration: Amp vs Beam Offset Y 0→-875mm Dataset BPM Y1 BPM Y2 BPM Y3 Amplitude Y 0→+875mm Dataset BPM Y1 BPM Y2 BPM Y3 Amplitude ATF BPM – Toyoko Orimoto
Amplitude: Res & Cross-coupling (II) X 0→-875mm Dataset Y2 Amp Y2 Amp X2 Amp X2 Amp X3 Amp X1 Amp Y1 Amp Y3 Amp X 0→+875mm Dataset Y2 Amp Y2 Amp X2 Amp X2 Amp X3 Amp X1 Amp Y1 Amp Y3 Amp ATF BPM – Toyoko Orimoto