Treatment of Quality in Utility Specification and Procurement of Network Equipment. Trevor LUCY – IE – S1 – 1118. Treatment of Quality in Utility Specification and Procurement of Network Equipment. Background Specifications References Factory Inspections Post Tender Quality Control Summary.

lihua
Download Presentation

Trevor LUCY – IE – S1 – 1118

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Treatment of Quality in Utility Specification and Procurement of Network Equipment Trevor LUCY – IE – S1 – 1118

  2. Treatment of Quality in Utility Specification and Procurement of Network Equipment • Background • Specifications • References • Factory Inspections • Post Tender Quality Control • Summary Trevor LUCY – IE – S1 – 1118

  3. Background • Many problems in the past • Operational and financial impact • Appointment of Specifications Manager in ESBN • Works with Asset Managers to drive quality improvement Trevor LUCY – IE – S1 – 1118

  4. Specifications • Quality criteria in the Tender Specification • Quality Management Systems • Routine and Type Tests • Track Record • Production experience • At least X years… • Service experience • Installation in at least S EU Utilities • With a service experience of Y years… of at least Z units Trevor LUCY – IE – S1 – 1118

  5. References • Essential to request in specification • Obtain named individual • Verify volumes and experience • Difficulties when sold through agents They won’t help you pick the best but will help you avoid the worst! Trevor LUCY – IE – S1 – 1118

  6. Factory Inspections • Audit Template • Raw material through to end product • Factory Internal QC Procedures • Review recommendations in last Quality audit • Capability & experience of Test Area • Test equipment calibration • Any future plans for the factory? Trevor LUCY – IE – S1 – 1118

  7. Post Tender Quality Control • Compliance with Type & Routine Tests • Monitor initial deliveries • QA Groups – internal and external • Change notification from supplier to ESBN • Contingency Plans • Alternative suppliers • Supplier minimum stock holding Trevor LUCY – IE – S1 – 1118

  8. Summary • Need to ensure continuous high quality product • Drive for quality improvement is ongoing in ESBN • Considering future options re financial penalties! • Value of Quality to a Utility Quality Assurance in ESBN is not a replacement for supplier’s internal Quality Control but is a focussed way of dealing with suppliers to ensure acceptable standards exist in all plants in the Supply Chain. Trevor LUCY – IE – S1 – 1118

  9. Thank You Trevor LUCY – IE – S1 – 1118